Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mosquito Repellant Cream Spray And Lotion,Air Freshener Liquid (V2),Glass Cleaner, Liquid (V2) As
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | July 06, 2025 00:30 |
End Date |
25/07/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read morePainting to runway, taxi tracks, loops to bps, dispersal etc in air filed and conduct of rrs exercise on quartely basis or as per requirment of station including material tools and plant in tech area at af stn halwara
Painting to runway, taxi tracks, loops to bps, dispersal etc in air filed and conduct of rrs exercise on quartely basis or as per requirment of station including material tools and plant in tech area at af stn halwara
Read moreSketch pen (v2),packaging tape,air freshener solid and gel,bills or bill books (v2),packaging tape,
Read more
Mosquito repellant cream spray and lotion,air freshener liquid (v2),glass cleaner, liquid (v2) as
Read more
Toilet soap, liquid (v2) as per is 4199,air freshener solid and gel,air freshener liquid (v2),disin
Read more
Up gradation of air conditioning system of sldc server rooms and other rooms by providing centralized ac for entire sldc separate alternate lt line from other feeder and allied works as per requirement of uldc iii
Up gradation of air conditioning system of sldc server rooms and other rooms by providing centralized ac for entire sldc separate alternate lt line from other feeder and allied works as per requirement of uldc iii
Read moreWind sock,toilet cleaner liquid (v2) conforming to is 7983,high density polyethylene bucket,sweepin
Read more
Varnishes or shellac varnish as per is 347,liquid soap dispenser (v2),liquid soap dispenser (v2)
Read more
of your Industry type