Tender Details
Particulars | Details |
---|---|
Title |
General Crds Agly Am 24 25 Annual Maintenance Of Clearing And Removing Silt From The Canals Kalady Main Canal Bw Ch1 100 Km To 2 000 Km Mundopilly Branch Canal Bw Ch 0 650 Km To Ch 1 200 Km Vengoor Branch Canal Bw Ch 5 050 Km To 6 100 Km And Kala
|
Description |
Anualmaintenancework Of Canal
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_685172_1 |
Reference Number |
IRR/PII/TR/2268/2024_5_1_1/1 |
Tender Fee | 735 |
EMD | 8338 |
Tender Value | |
Place | mookkannur |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1066172 |
Start Date | August 12, 2024 22:30 |
End Date |
21/08/2024 ( Expired 287 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
General sabarimala festival 2024 25 upgradation with bm and bc 9.00 km providing bm and bc to various connecting roads in mavelikara lac such as vathikulam chunakara north from ch 0 000 to ch 1 200 vathikulam chunakara south from ch 0 000 to ch
General sabarimala festival 2024 25 upgradation with bm and bc 9 00 km providing bm bc to various connecting roads in mavelikara lac such as vathikulam chunakara north from ch 0 000 to ch 1 200 vathikulam chunakara south from ch 0 000 to ch 3
Read moreGeneral-mp-rbc-mansoon preparednessfor the year 2025-26 cutting trees and branches from canal bund ch0/550 km to 20/000 km of rbc and its branch canals,cleaning field channel atch7/000 km of rbc and ut at ch0/800 km of puduppariyaram branch canal
The proposed work is scheduled at ch ch0/800&#x0d km of puduppariyaram branch canal,where the&#x0d ut is blocked due obstruction like stones and&#x0d silt inside th ut. manual removal of this from&#x0d the ut is difficult .we need to excavate the soil&#x0d
Read moreGeneral sabarimala festival 2024 25 bc overlay 6 050 km improvement works in chulliyoor chadachimarthandam road bc overlay ch 0 000 to ch 6 050 marayamuttam to paliyodu general civil work
General sabarimala festival 2024 25 bc overlay 6 050 km improvement works in chulliyoor chadachimarthandam road bc overlay ch 0 000 to ch 6 050 marayamuttam to paliyodu general civil work
Read moreGeneral budget work 2024 25 20 percentage overlay with bc 1 100 km improvements to bsnl road in varkala town roads using bc overlay and allied works from ch 0 000 to 1 100 general civil work
General budget work 2024 25 20 percentage overlay with bc 1 100 km improvements to bsnl road in varkala town roads using bc overlay and allied works from ch 0 000 to 1 100 general civil work
Read moreGeneral sabarimala festival work 202 25 upgradation with bm bc 1.200 km improvements to haripad tb junction vellamkulangara road ch 0 000 to 1 200 general civil work
General sabarimala festival work 202 25 upgradation with bm bc 1.200 km improvements to haripad tb junction vellamkulangara road ch 0 000 to 1 200 general civil work
Read moreDeposit dist panchayath 2025 2026 cpp kkps annual maintenance of field channels offtaking from ch 0 000 to 30 600 km of kunnamkattupathy main canal and its branch canals for the year 2025 26 general civil work general civil work deposit dist panc
Deposit dist panchayath 2025 2026 cpp kkps annual maintenance of field channels offtaking from ch 0 000 to 30 600 km of kunnamkattupathy main canal and its branch canals for the year 2025 26 general civil work general civil work deposit dist panc
Read moreGeneral-sabarimala festival 2024-25- improvements to kilimanoor policestation tholikuzhy road ch.0 000 to 5 200 km in attingal lac-general civil work
General-sabarimala festival 2024-25-&#x0d improvements to kilimanoor policestation&#x0d tholikuzhy road ch.0 000 to 5 200 km in&#x0d attingal lac-general civil work
Read moreGeneral wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km
General wp cada 2024 2025 modernization of field channel offtakes from the ch 05 087 km rhs of pudussery major canal in between ch 0 000 km to 0 300 km offtakes ch 6 400 km rhs between ch 0 000km to 0 300 km
Read moreGeneral rm 2024 25 rc 2 phase 2 zone 1 having 11.65 km road length, one year running contract for various 2 road streches under ezhukone roads section in kollam district moorthikavu manakkarakavu road ch 0 000 to 5 200 5.2km neduvathur puthur road
General rm 2024 25 rc 2 phase 2 zone 1 having 11.65 km road length, one year running contract for various 2 road streches under ezhukone roads section in kollam district moorthikavu manakkarakavu road ch 0 000 to 5 200 5.2km neduvathur puthur road
Read moreGeneral-emergency-mp- rbc-urgent removal of rock by blasting and stacking stone to the edges at rbc main canal ch 6/200 km and removing top slabs and cleaning of cut cover at ch 6/100 km -general civil work
Big rock was fallen from the right side bund&#x0d of rbc main canal at ch 6/200 km. since the&#x0d region was high cutting area, rock was only&#x0d found during canal cleaning process.as the&#x0d rock was huge and it will cause obstruction for&#x0d water distributi
Read moreof your Industry type