Tender Details
Particulars | Details |
---|---|
Title |
Slope Protection And Toe Drain Construction Along North Dyke And East Dyke (Phase I) Of Lagoon # 2 Of Ash Pond Ktps, Koderma
|
Description |
Slope Protection And Toe Drain Construction Along North Dyke And East Dyke (Phase I) Of Lagoon # 2 Of Ash Pond Ktps, Koderma.
|
Organisation | Damodar Valley Corporation | Public Sector Undertakings |
Tender Id | 2024_DVC_199199_1 |
Reference Number |
DVC/Tender/Head Quarter/Power House Civil/CMM/Works and Service/00051/Capital |
Tender Fee | 12000 |
EMD | 10 Lakh |
Tender Value | |
Place | DVC KTPS |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218075 |
Start Date | June 24, 2024 19:30 |
End Date |
04/07/2024 ( Expired 324 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreSupply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreConstruction of rain water harvesting recharge well along with storage tank and connecting drain at hvdc station alipurduar
Construction of rain water harvesting recharge well along with storage tank and connecting drain at hvdc station alipurduar
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreZone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Read moreConstruction of strom water drain with culvert to gurulingapuram oht north(west 2nd street) 128009r137),gurulingapuram oht 1st south street 128009r125), gurulingapuram oht north(east 4th street) 128009r139), sattur municipality
Construction of strom water drain with culvert to gurulingapuram oht north(west 2nd street) 128009r137),gurulingapuram oht 1st south street 128009r125), gurulingapuram oht north(east 4th street) 128009r139),sattur municipality
Read moreConstruction of a paid-to-paid skywalk link between cmrl phase-i and phase-ii vadapalani stations
Construction of a paid-to-paid skywalk link between cmrl phase-i and phase-ii vadapalani stations
Read moreExtension and renovation of control room building along with roof treatment and renovation of switchyard, construction of cable trench, approach road,surface drain, surrounding area development, and other ancillary civil works at nayagram
Extension and renovation of control room building along with roof treatment and renovation of switchyard, construction of cable trench, approach road,surface drain, surrounding area development, and other ancillary civil works at nayagram
Read moreRaising of boundary wall including construction of retaining walls adjacent to south-east side storm-sewer drain in csir-nml housing complex, agrico for the year 2024-25 and 2025-26
Raising of boundary wall including construction of retaining walls adjacent to south-east side storm-sewer drain in csir-nml housing complex, agrico for the year 2024-25 and 2025-26
Read moreof your Industry type