Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Shifting And Re Commissioning Etc And Day To Day Running Maintenance Of 5 Nos 500 Gpm Pump Motor Sets At Konar And Jrd Siding Pf1 Along With Pumps At Konar And Damodar Riverside Feeding Raw Water To Konar Siding And Jrd Pf1 At Akk Ocp Bn
|
Description |
Dismantling, Shifting And Re Commissioning Etc And Day To Day Running Maintenance Of 5 Nos 500 Gpm Pump Motor Sets At Konar And Jrd Siding Pf1 Along With Pumps At Konar And Damodar Riverside Feeding Raw Water To Konar Siding And Jrd Pf1 At Akk Ocp Bn
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_330153_1 |
Reference Number |
PE(EnM)/AKK OCP/e-tender/24-25/63 |
Tender Fee | 0 |
EMD | 32800 |
Tender Value | |
Place | AKKOCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342232 |
Start Date | February 24, 2025 23:30 |
End Date |
05/03/2025 ( Expired 100 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling and shifting 1 no, pump with motor with reinstallation 90kw, 550v motor with 100hp. 3 stage pump at docp 38 quarry for raw water supply at docp staff colony, enm water reservoir and railway siding colony
Dismantling and shifting 1 no, pump with motor with reinstallation 90kw, 550v motor with 100hp. 3 stage pump at docp 38 quarry for raw water supply at docp staff colony, enm water reservoir and railway siding colony
Read moreDismantling, shifting, erection and re-commissioning of 30 mtrs wireless repeater tower along with its complete accessories, installed at east ob dump dudhichua project
Dismantling, shifting, erection and re-commissioning of 30 mtrs wireless repeater tower along with its complete accessories, installed at east ob dump dudhichua project
Read moreDismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Read moreDismantling ,shifting and re-erection of 16 mtr high mast tower along with repair of existing high mast tower at various locations for mines expansion at different places of lingaraj ocp, lingaraj area
Dismantling ,shifting and re-erection of 16 mtr high mast tower along with repair of existing high mast tower at various locations for mines expansion at different places of lingaraj ocp, lingaraj area
Read moreAnnual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Read moreDay to day shifting relocation of pump-motor and accessories to be installed at different location of mines and repairing of different dia delivery ranges running at patch a area and dismantling of 8 dia pipe from 5 mva substation
Day to day shifting relocation of pump-motor and accessories to be installed at different location of mines and repairing of different dia delivery ranges running at patch a area and dismantling of 8 dia pipe from 5 mva substation
Read moreDay to day shifting or extension of ht overhead line feeding power from 33kv main substation to mobile crusher, hemm, field lighting transformers and pumps at amadand ocp, jk area.
Day to day shifting or extension of ht overhead line feeding power from 33kv main substation to mobile crusher, hemm, field lighting transformers and pumps at amadand ocp, jk area.
Read moreDismantling, shifting and re-commissioning etc and day to day running maintenance of 5 nos 500gpm pump-motor sets at konar and jrd siding pf1 along with pumps at konar and damodar riverside feeding raw water to konar siding and jrd pf1 at akk ocp bn
Dismantling, shifting and re-commissioning etc and day to day running maintenance of 5 nos 500gpm pump-motor sets at konar and jrd siding pf1 along with pumps at konar and damodar riverside feeding raw water to konar siding and jrd pf1 at akk ocp bn
Read moreInstallation dismantling shifting of pump motor pontoon starter field switches pipelines (flexible/ms/gi etc) cables hoses along with related accessories and works before and during monsoon as and when required for monsoon 25 at ksl project.
Installation dismantling shifting of pump motor pontoon starter field switches pipelines (flexible/ms/gi etc) cables hoses along with related accessories and works before and during monsoon as and when required for monsoon 25 at ksl project.
Read moreFitting of 3.3kv pump motor set, dismantling, lifting and also lowering of submersible pumps etc at jambad ocp
Fitting of 3.3kv pump motor set, dismantling, lifting and also lowering of submersible pumps etc at jambad ocp
Read moreof your Industry type