Tender Details
Particulars | Details |
---|---|
Title |
Electrification Of Rob, Modification Of Ohe And Modification Of 33 Kv Or 11 Kv Or Lt Lines In Connection With Proposed Rob In Lieu Of Lc No. 07 At Kbahal (Km. No. 532/33 35) , Lc No. 10 At Barpali (Km No.551/19 21) &Amp Lc No. 11 At Sardega (Km. No. 559/18 20) And Left Over Work Between Mcl Block Cabin Barpali For Doubling Of Mcl Private Siding Line In Chakradharpurdivision. Ii)provision Of Auxiliary Transformer In Between Mcl Block Cabin Barpali Section For Auto Signalling In Connect
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77278399 |
Reference Number |
02-TENDER-EL-CON-CKP-24-2 |
Tender Fee | 0 |
EMD | 3.82 Lakh |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77278399/viewNitPdf_4707479.pdf |
Start Date | September 11, 2024 16:47 |
End Date |
14/10/2024 ( Expired 189 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreRob/qc/udalguri/rm-33 3rd party monitoring and quality control for the work construction of rob at lc gate no. rm-33 at rly km-60/7-8 on golma chowk to mission chariali road in udalguri district of assam under construction of robs on 50_50 cost shari
Rob/qc/udalguri/rm-33 3rd party monitoring and quality control for the work construction of rob at lc gate no. rm-33 at rly km-60/7-8 on golma chowk to mission chariali road in udalguri district of assam under construction of robs on 50_50 cost shari
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreConstruction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreProviding architectural and engineering consultancy services for construction of rob in lieu of lc no. 57 at km 198 17 19 between amarda road
Providing architectural and engineering consultancy services for construction of rob in lieu of lc no. 57 at km 198 17 19 between amarda road and basta of kharagpur division, odisha
Read more(a)design, supply, erection, testing & commissioning of 25 kv ac, single phase ohe including modification in existing ohe, due to construction of rob at lc no.81 (between ghoti-padali),87 (between devlali-nashik rd), 93a (between odha-kherwadi),94 (between odha-kherwadi),98 (between kasabesukene-niphad) , 101(between niphad-ugaon) & 88 (village road) at km 185/28-30(dvl-nkrd) (b) removal of lt , ht infringement in connection with construction of rob/rub work in bhusawal division of
For complete deion and other details, please refer to tender
Read moreConstruction of 4 lane rob including railway portion with n type steel girder and composite girder on pile foundation. psc girder on pile foundation and reinforced earth (re) wall in approaches in lieu of lc no. 25-b at rly. km 591/6-7 between jatpipli -bajana stations on viramgam - samakhiyali section of ahmedabad division of western railway under gati shakti unit, ahmedabad.
For complete deion and other details, please refer to tender
Read moreDesign, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works, in connection with following works: (1)construction of rob at km. 662/18-19 at badnera station. (2)construction of rob & lhs in lieu of lc no. s-2 at km. 666/07-08 on badnera-amravati section.
For complete deion and other details, please refer to tender
Read moreDesign, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works, in connection with following works : (1)construction of rub in lieu of lc no. jk-6 at km. 545k/21-22 on jalamb-khamgaon section. (2)construction of rob at rly. km. 417/23n-25n on jalgaon-shirsoli section.
For complete deion and other details, please refer to tender
Read moreDesign, drawing, modification, supply, erection, testing and commissioning of 25kv ohe for proposed garhwa phase-ii and removal of ohe infringement work in connection to rob in lieu of lc 39/spl/t at km. 120/03-05 between bhurkunda - patratu, 35/b/t (s&t no. 13/b/t) at km. 217/10-12 between demu - latehar & others rub/ lhs ( 4/c/e, 5/c/t, 6/c/t, 7/c/e, 10a/c/e, 11/c/t, 16/c/e, 17/c/t, 19/c/e, 24/c/t, 26/c/t, 38/spl/e, 28/c/e, etc) under dhanbad division under dy.cee/c/s/mhx
For complete deion and other details, please refer to tender
Read moreof your Industry type