Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Electrification Of Rob, Modification Of Ohe And Modification Of 33 Kv Or 11 Kv Or Lt Lines In Connection With Proposed Rob In Lieu Of Lc No. 07 At Kbahal (Km. No. 532/33 35) , Lc No. 10 At Barpali (Km No.551/19 21) &Amp Lc No. 11 At Sardega (Km. No. 559/18 20) And Left Over Work Between Mcl Block Cabin Barpali For Doubling Of Mcl Private Siding Line In Chakradharpurdivision. Ii)provision Of Auxiliary Transformer In Between Mcl Block Cabin Barpali Section For Auto Signalling In Connect
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77278399 |
|
Reference Number |
02-TENDER-EL-CON-CKP-24-2 |
| Tender Fee | 0 |
| EMD | 3.82 Lakh |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77278399/viewNitPdf_4707479.pdf |
| Start Date | September 11, 2024 16:47 |
| End Date |
Expired
14/10/2024
Expired 734 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Proposed construction of rob for elimination of manned lc at lc no. 554 at km 1098/33-35 between chcr (chacher)-sal(salwa) block section.
Read moreOhe modification work in connection with provision of new rob in lieu of lc gate no. nn-105 at kamg nunder aden/east/apdj.
Ohe modification work in connection with provision of new rob in lieu of lc gate no. nn-105 at kamg nunder aden/east/apdj.
Read moreDesign, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.
Design, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.
Read moreShifting of 33 kv, 11 kv & lt oh lines for clearing of electrical infringement and modification of 33 kv & 11 kv / lt track crosing by ug cables in connection with construction of dubling bg rly. line from furkating (fkg) excluding to new tinsukia (ntsk).
Shifting of 33 kv, 11 kv & lt oh lines for clearing of electrical infringement and modification of 33 kv & 11 kv / lt track crosing by ug cables in connection with construction of dubling bg rly. line from furkating (fkg) excluding to new tinsukia (ntsk).
Read moreDesign, supply, erection, testing & commissioning of 25 kv ac ohe in connection with provision of rob in lieu of lc gate no. 08 at km 218/4-5 on pune daund section, lc gate no. 02 at km 199/6-7 on pune daund section, lc gate no. 36a at km 136/16-17 on pune lonavala section and lc gate no. 45(kanhe gate) at km 148/5-6 on kanhe-vadgaon block section and ni related ohe work of lonand-phaltan and ahmednagar-beed-parli section of pune division
Design, supply, erection, testing & commissioning of 25 kv ac ohe in connection with provision of rob in lieu of lc gate no. 08 at km 218/4-5 on pune daund section, lc gate no. 02 at km 199/6-7 on pune daund section, lc gate no. 36a at km 136/16-17 on pune lonavala section and lc gate no. 45(kanhe gate) at km 148/5-6 on kanhe-vadgaon block section and ni related ohe work of lonand-phaltan and ahmednagar-beed-parli section of pune division
Read moreMcl sardega rob
Construction of rob br no91a 1x54m bow string girder4 lane
 ch 3760m for the proposed development of rail infrastructure for proposed 02 nos. rls20 mtyadjacent to sardega siding at mahalaxmi area, ib coalfields of mcl
Read morePart-i) electrification of rob, modification of ohe and modification of 33 kv or 11 kv or lt lines in connection with proposed rob in lieu of lc no. 239 & fob at lc no. 240 in bamra yard at km. 477/01-03 in rou-jsg section in ckp division. part-ii)p
For complete deion and other details, please refer to tender
Read more25 kv ohe modification work in connection with construction of rob at lc- 40a, rob & rub at lc- 01 c ,rub at lc- 77 spl prg station in view of mahakumbh mela 2025 over lucknow division northern railway.
For complete deion and other details, please refer to tender
Read more25 kv ohe modification work in connection with construction of rob at lc- 23-c (kvx-aj), rob at lc- 13 spl (hrb yard), rub at lc-07 (amg-tpnr) and rub at lc- 187a (lbh-ml) lucknow area over lucknow division northern railway.
For complete deion and other details, please refer to tender
Read moreProvision of rob at lc-33 between gwl-bix section of jhs division
For complete deion and other details, please refer to tender
Read moreof your Industry type