Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work Of The Improvements To Karapotta Choolipadam Road Km 0/000 To 4/000
|
| Description |
Balance Work Of The Improvements To Karapotta Choolipadam Road Km 0/000 To 4/000
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWD_675881_1 |
|
Reference Number |
RD/2017/10139_2 |
| Tender Fee | 5515 |
| EMD | 50000 |
| Tender Value | - |
| Place | Palakkad |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1054309 |
| Start Date | June 27, 2024 19:30 |
| End Date |
Expired
06/07/2024
Expired 829 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Geometric improvements at pulipanam valvachagostam road km 0 0 0 6
Geometric improvements at pulipanam valvachagostam road km 0 0 0 6
Read moreGeneral sabarimala festival 2026 27 improvements to njarakkat road ch 0 000 to ch1 500 providing bm patch and bc overlay to njarakkatt road ch 0 000 to ch 1 500 under north paravur section general civil work
The estimate includes the required items for pavement strengthening drainage and allied works including bm bc m15 m20 concrete works for drain and traffic safety provisions, as applicable to the site conditions
Read moreGeneral sabarimala festival 2026 27 improvements to footpath in gothuruth road ch 0 000 to ch1 450 providing bm patch and bc overlay to footpath in gothuruth road ch 0 000 to ch1 450 under north paravur sectiongeneral civil work
The estimate includes the required items for pavement strengthening, drainage and allied works, including bm, bc, m15, m20 concrete works for drain and traffic safety provisions
Read moreGeneralsabarimala festival work 2025 26 improvements to pallickal punnamoodu road from ch 0 000 to 2 200 by providing bm amp bc general civil work
Generalsabarimala festival work 2025 26 improvements to pallickal punnamoodu road from ch 0 000 to 2 200 by providing bm amp bc general civil work
Read moreGeneral budget 2026 27 20percentage provision improvements and upgrading of palakathod kootavil elayoor road from mss surface to bm bc surface between km 0/000 0/700-malappuram lac-general civil work
General budget 2026 27 20percentage provision improvements and upgrading of palakathod kootavil elayoor road from mss surface to bm bc surface between km 0/000 0/700-malappuram lac-general civil work
Read moreGeneral b w 2025 26 20 percentage improvements to munnar town top station bypass road working ch 0 000 to 1 650 general civil work 1
These roads have some portions of interlocking tiles along the panchayath road portion and chipping carpet roads in pwd ,but the surfaces are in very poor condition and unfit for the vast volumes of traffic hence that portion has to be strengthened b
Read moreRestoration of rain damages on chamba tissa road km. 0/0 to 5/000 (sh p/l 30 mm thick bituminous concrete in km. 1/000 to 2/000 against pdna-2025
Restoration of rain damages on chamba tissa road km. 0/0 to 5/000 (sh p/l 30 mm thick bituminous concrete in km. 1/000 to 2/000 against pdna-2025
Read moreUp-gradation of link road from bani to parola km 0/000 to 0/740
Providng and laying prime coat ,tack,along with 30mm thick bituminous concrete in km 0/0000 to 0/450). (ii) link road from lohar kainchi to rihad km 0/000 to 1/100(sh providng and laying prime coat ,tack,along with 30mm thick bituminous conc
Read moreRepair and maintenance on link road to harizan basti nari to jhamber km. 0/000 to 4/000
Sh- providing and laying 30mm thick bituminous concrete in km. 0/000 to 3/000) under head pdna- 2025
Read moreRestoration of rain damages on road gabli thehar, baidi mehrna trembla road km. 0/000 to 10/000)
Sh- c/o c.c. pavement at rd 2/010 to 2/050 under head sdf with scheme id-sdrf/2026/242)
Read moreof your Industry type