Tender Details

Particulars Details
Title
Submersible Pump At Different Places.
Description
Sinking Of (2 Nos.) 100 Mm X 50 Mm.Dia. X 120 Mtr. Depth, Submersible Pump At Different Places Within Garbeta I Block Under Midnapore Division, Phe Dte
Organisation Government of West Bengal
Tender Id 2023_PHED_570730_7
Reference
Number
eNIT_15_OF_AE_RWS_OF_2023_2024
Tender Fee -
EMD 7557
Tender Value -
Place Midnapore
Link
View Original Tender Notice

https://wbtenders.gov.in

Start Date September 18, 2023 23:30
End Date
Expired 25/09/2023

Expired 1103 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.

Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.

Read more
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years

Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years

Read more
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.

Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Submersible pump at different places.

Submersible pump at different places.

Read more
Submersible pump at different places.

sinking of (4 nos.) 100 mm x 50 mm.dia. x 120 mtr. depth, submersible pump at different places within garbeta-iii block under midnapore division, phe dte.

Read more
Submersible pump at different places.

Sinking of (4 nos.) 100 mm x 50 mm.dia. x 120 mtr. depth, submersible pump at different places within keshpur block under midnapore division, phe dte.

Read more
Submersible pump at different places.

sinking of (4 nos.) 100 mm x 50 mm.dia. x 120 mtr. depth, submersible pump at different places within keshpur block under midnapore division, phe dte.

Read more
Submersible pump at different places.

sinking of (3 nos.) 100 mm x 50 mm.dia. x 120 mtr. depth, submersible pump at different places within garbeta-iii block under midnapore division, phe dte.

Read more
Submersible pump at different places.

sinking of (2 nos.) 100 mm x 50 mm.dia. x 120 mtr. depth, submersible pump at different places within debra block under midnapore division, phe dte

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise