Tender Details
About Tender
🛣️ Bid Invitation For Road Maintenance Work 🛣️ The Chief Engineer, Pwd (R And B), State Govt. And Ut, Invites Bids For The Maintenance Of A Road Stretch From Mayur Gate To By Pass Road, Covering A Length Of 0.10 Km Under Bmc Ward No Iii, Bishalgarh. 🚦 📅 Bid Submission Deadline: July 25, 2024, 3:00 Pm Tender Fee: Inr 1000 Emd: Inr 48409 The Scope Of Work Includes Sh Flat Brick Soling, Wbm Iii, Paver Block, And Rcc Protection Work For The Specified Length Of The Road. 🏗️ Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, By The Stipulated Date And Time. Keywords: Road Maintenance, Pwd (R And B), State Govt. And Ut, Bmc Ward No Iii, Bishalgarh, Infrastructure, Construction, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Maintenance Of Road From Mayur Gate To By Pass Road L 1 Point 00 Km / Portion From Ch 0 Point 00 Km To Ch 0 Point 10 Km L 0 Point 10 Km Under Bmc Ward No Iii During The Year 2024 25 / Sh Flat Brick Soling Wbm Iii Paver Block Rcc Protection Work
|
Description |
Maintenance Of Road From Mayur Gate To By Pass Road L 1 Point 00 Km / Portion From Ch 0 Point 00 Km To Ch 0 Point 10 Km L 0 Point 10 Km Under Bmc Ward No Iii During The Year 2024 25 / Sh Flat Brick Soling Wbm Iii Paver Block Rcc Protection Work
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2024_CEPWD_50631_1 |
Reference Number |
20/R/EE-BSLD/PWDRnB/2024-25 |
Tender Fee | 1000 |
EMD | 48409 |
Tender Value | |
Place | Bishalgarh |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=51473 |
Start Date | July 04, 2024 22:00 |
End Date |
25/07/2024 ( Expired 322 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Improvement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Read moreMtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreDevelopment of road frombaideyamuradurgachowmuhani tomullarbandh bridge via baideyamura sb schooll1.145 km(portion from ch 0.735 km to ch 1.145 km l 0.410 km)within nalchar rdblock sepahijalatripura under the jurisdictionof melaghar pwd
Sh patch soling wbm carpeting road side pucca drain and allied works
Read moreMtc of road from baishnab tilla kalibari to ayushman arogya mandir and other adjacent roads (l 0.35 km) under amc ward no 49, 14badharghat assembly constituency during the year 2025-26
Sh rcc drain, brick soling, wbm-iii, grouting, carpeting etc.&#x0d &#x0d
Read moreMtc of road from kambaltilla bazar to bagan para (l 3.00 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, patch recarpeting, seal coat etc portion from ch 0.00km to ch 1.50 km.
Mtc of road from kambaltilla bazar to bagan para (l 3.00 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, patch recarpeting, seal coat etc portion from ch 0.00km to ch 1.50 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 8.00km to ch 12.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 8.00km to ch 12.00 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 4.00km to ch 8.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 4.00km to ch 8.00 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 0.00km to ch 4.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 0.00km to ch 4.00 km.
Read moreUrgent mtc of road from kambaltilla bazar to bagan para (l- 3.00 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, carpeting, seal coat etc portion from ch 1.50km to ch 3.00km.
Urgent mtc of road from kambaltilla bazar to bagan para (l- 3.00 km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh patch wbm-3, carpeting, seal coat etc portion from ch 1.50km to ch 3.00km.
Read moreof your Industry type