Tender Details

Particulars Details
Title
Supply Of Aggregate At Construction Of 4 Lane Rail Overhead Bridge Near Subedarganj Railway Station From Gt Road To Airport Road In District Prayagraj
Description
Supply Of Aggregate At Construction Of 4 Lane Rail Overhead Bridge Near Subedarganj Railway Station From Gt Road To Airport Road In District Prayagraj
Organisation Government of Uttar Pradesh
Tender Id 2023_UPSBC_868904_1
Reference
Number
2819/Tender-53/23-24 Dated 06.12.2023
Tender Fee 5900
EMD 6.49 Lakh
Tender Value -
Place Office of Chief Project Manager, Prayagraj Zone, U
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date December 08, 2023 15:00
End Date
Expired 08/01/2024

Expired 1011 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Estimate for clearance of weed, jalla, deela, sarkanda, jungle,butti, dhora, silts etc. manually from inner section of bhai bakhtaur branch rd 0 - 28600 and desilting from vrb rd 4800 and railway siphon at rd 16320 and gt road bridge 16420 , gt road

Estimate for clearance of weed, jalla, deela, sarkanda, jungle,butti, dhora, silts etc. manually from inner section of bhai bakhtaur branch rd 0 - 28600 and desilting from vrb rd 4800 and railway siphon at rd 16320 and gt road bridge 16420 , gt road

Read more
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km

Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km

Read more
Development of roundabout, junction improvement and lane widening for long term rectification of blackspot no. 464 (gram arjun nala/railway bridge) on silwani- katangi - bonkatta road under chhindwara division

Development of roundabout, junction improvement and lane widening for long term rectification of blackspot no. 464 (gram arjun nala/railway bridge) on silwani- katangi - bonkatta road under chhindwara division

Read more
Construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t

Construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t

Read more
Appointment of consultant for techno-economic feasibility study, detailed engineering, engineering design, cost estimates, tender documents and technical specifications for construction of a 4-lane road over bridge (rob) for inter terminal rail handl

Appointment of consultant for techno-economic feasibility study, detailed engineering, engineering design, cost estimates, tender documents and technical specifications for construction of a 4-lane road over bridge (rob) for inter terminal rail handl

Read more
Modification to the existing ohe in connection with the construction of two lane rub between atgaon & thansit at kmm.98/2 in kalamgaon at hydraulic bridge on kalyan-manmad section mumbai division of central railway

Modification to the existing ohe in connection with the construction of two lane rub between atgaon & thansit at kmm.98/2 in kalamgaon at hydraulic bridge on kalyan-manmad section mumbai division of central railway

Read more
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction

Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction

Read more
Supply, erection, testing, commissioning of retractable overhead conductor-rail system (rocs) including transition arrangement from conventional ohe to retractable ohe including all accessories and electrical general services works in connection with creation of trip maintance/ advance inspection centres at shm for inspection & maintenance activity of electric locomotives of kharagpur division, south eastern railway

Supply, erection, testing, commissioning of retractable overhead conductor-rail system (rocs) including transition arrangement from conventional ohe to retractable ohe including all accessories and electrical general services works in connection with creation of trip maintance/ advance inspection centres at shm for inspection & maintenance activity of electric locomotives of kharagpur division, south eastern railway

Read more
Construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & com

Construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & com

Read more
Construction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"

Construction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise