Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing And Laying Of Hume Pipe At Various Places In Mines And Industrial Area As, When And Wherever Required Basis At Amlohri Project.
|
| Description |
Providing And Laying Of Hume Pipe At Various Places In Mines And Industrial Area As, When And Wherever Required Basis At Amlohri Project.
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_329214_1 |
|
Reference Number |
SO(C)/Aml/24-25/ETN/36 |
| Tender Fee | 0 |
| EMD | 99200 |
| Tender Value | - |
| Place | Amlohri |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341241 |
| Start Date | February 20, 2025 15:00 |
| End Date |
Expired
07/03/2025
Expired 584 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Read moreKtps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Ktps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreCarrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Read moreKtps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.
Ktps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreExpression of interest (eoi) for empanelment of agency for providing skilled man power services as and when and where required with all equipments & machineries (outsourcing) for comprehensive repair, operation and maintenance of urban water supply scheme under ‘peyjal nischay yojana’ of nagar parishad, motipur.
Expression of interest (eoi) for empanelment of agency for providing skilled man power services as and when and where required with all equipments & machineries (outsourcing) for comprehensive repair, operation and maintenance of urban water supply scheme under ‘peyjal nischay yojana’ of nagar parishad, motipur.
Read moreEm-divn:preventive annual maintenance and servicing of ms chhabi electrical pvt ltd make 220v 850a 220v 570a 220v 40a 220v25 220v 100a and 48v 25a dc chargers located at main plant silo raw water pump house and switchyard as and when required during the year 2026 27
Em-divn:preventive annual maintenance and servicing of ms chhabi electrical pvt ltd make 220v 850a 220v 570a 220v 40a 220v25 220v 100a and 48v 25a dc chargers located at main plant silo raw water pump house and switchyard as and when required during the year 2026 27
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreProviding and laying of hume pipe at various places in mines and industrial area as, when and wherever required basis at amlohri project
Providing and laying of hume pipe at various
 places in mines and industrial area as, when and wherever required basis at amlohri project
Read moreof your Industry type