Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
07/Ce(gzb)/Nit/2024 25/85/Ee/Gcd/2024 25
|
| Description |
Comprehensive Consultancy Services Including Suggestion For Upgradation Scheme Of Existing Buildings In The Ntiprit Previously Known As Alttc Center At Ghaziabad Campus As Well As Providing Preparation Of Digital Survey Plan Of Campus Soil Testing Of Site Conceptual Drawings Detailed Working Drawings Section And Elevation Structural Design Drawings Civil And Electrical Services Drawing Including Approval From The Client And Local Statuary Body Wherever Required And Preparation Of Preliminary Estimate Cum Detailed Estimate Of Building Suggested For Renovation And Preparation Of Master Plan Of Whole Campus Including Old Building And Proposed New Buildings
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 81893 |
|
Reference Number |
07/CE(GZB)/NIT/2024-25/85/EE/GCD/2024-25 |
| Tender Fee | 0 |
| EMD | 3 Lakh |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642438313839332430372f434528475a42292f4e49542f323032342d32352f38352f45452f4743442f323032342d3235 |
| Start Date | July 12, 2024 21:16 |
| End Date |
Expired
30/07/2024
Expired 810 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work of doing mri of solar consumers having load upto 10 kw in different categories under edsd, balawala under edd, raipur.
Read moreConstruction of r.c.c. drain 1 x 0.45m x 0.60m with slab fromshiv mandir to house of dr. dharmveer singh
Read moreEngagement of motor vehicle (jeep/bolero/ tuv type and other) with driver service peiod of 24 month for s.d.o. edsd upcl khatima, u.s. nagar.
Read moreTnpgcl- nctps iii- preparation and supply of food items by operating industrial canteen at nctps stage-iii premises for a period of 6 months from the commencement.
Read moreWork of laying of underground xlpe cable for 33 kv line coming in the construction of foot over bridge in front of oxyhome society under edd-iii, loni
Read moreof your Industry type