Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Manufacturing Erection Of H.R.Gate At Tail Structure Of Koparde Aproach Canal Under Tarali Project, Under Control Of Executive Engineer Kanher Canal Division No.02,Karavadi(karad)
|
| Description |
Manufacturing Erection Of H.R.Gate At Tail Structure Of Koparde Aproach Canal Under Tarali Project, Under Control Of Executive Engineer Kanher Canal Division No.02,Karavadi(karad)
|
| Organisation | CE (Mechanical) Water Resource Department Nashik | State Govt. and UT |
| Tender Id | 2024_WRDMN_980803_1 |
|
Reference Number |
etender notice no 28 karvadi |
| Tender Fee | 2360 |
| EMD | 17000 |
| Tender Value | - |
| Place | satara |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1782070 |
| Start Date | February 27, 2024 21:20 |
| End Date |
Expired
12/03/2024
Expired 949 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Job work of manufacturing, providing erection of sluice valves with m.s. pipe arrangement instead of gates khatav left bank canal /right bank canal under the control of kanher canal division no.2,karavadi karad .
Job work of manufacturing, providing erection of sluice valves with m.s. pipe arrangement instead of gates khatav left bank canal /right bank canal under the control of kanher canal division no.2,karavadi karad .
Read moreJob work of manufacturing, providing and erection of sluice valves with m.s. pipe arrangement instead of gates khatav left bank canal /right bank canal under the control of kanher canal division no.2,karavadi karad .
Repair of canal outlet gate and its allied work on dhom balkawadi right bank canal km 3.450 to 66.400 for direct outlet, minor distributary and escape gate.
Read moreConstruction of retaning cum protection wall on tunnel exit at harphalwadi tal karad dist satara on koparde approach canal under tarali irrigation project
Construction of retaning cum protection wall on tunnel exit at harphalwadi tal karad dist satara on koparde approach canal under tarali irrigation project
Read moreConstruction of additional air valves on koparde approach canal syphon under tarali irrigation project tal dist satara
Construction of additional air valves on koparde approach canal syphon under tarali irrigation project tal dist satara
Read moreConstruction of protection wall near aqueduct of koparde approach canal tondoshi tal patan dist satara under tarali irrigation project
Construction of protection wall near aqueduct of koparde approach canal tondoshi tal patan dist satara under tarali irrigation project
Read moreProviding private vehicle on rent basis for site work under the office aarphal canal sub division no 5 karawadi kanher field channel lining subdivision koregaon and ujjani canal subdivision no 24 nagthane under tarali irrigation project tal karad
Providing private vehicle on rent basis for site work under the office aarphal canal sub division no 5 karawadi kanher field channel lining subdivision koregaon and ujjani canal subdivision no 24 nagthane under tarali irrigation project tal karad
Read moreConstruction of increasing height of syphon entry chamber and syphon exit chamber of koparde approach canal dist satara under tarali irrigation project
Construction of increasing height of syphon entry chamber and syphon exit chamber of koparde approach canal dist satara under tarali irrigation project
Read moreConstruction of approach road for syphon entry chamber at atit tal satara and syphon chamber tal koregaon of koparde approach canal under tarali irrigation project
Construction of approach road for syphon entry chamber at atit tal satara and syphon chamber tal koregaon of koparde approach canal under tarali irrigation project
Read moreRepair work of service gate,escape gate,head regulatory gate of kanher left bank canal and arfal canal under the control of executive engineer krishna irrigation division satara
Repair work of service gate,escape gate,head regulatory gate of kanher left bank canal and arfal canal under the control of executive engineer krishna irrigation division satara
Read moreConstruction of retaining walls 2 nos on u s side to the rcc box at crossing of pune miraj railway line ch 181 3 4 and koparde link canal km 27 240 near targaon tal koregaon dist satara under tarali project
Construction of retaining walls 2 nos on u s side to the rcc box at crossing of pune miraj railway line ch 181 3 4 and koparde link canal km 27 240 near targaon tal koregaon dist satara under tarali project
Read moreof your Industry type