Tender Details
Particulars | Details |
---|---|
Title |
Work Of Installation Of 01 New Tube Well Of 35 Hp Capacity In Ward 06 Nawada Shekhan Along With Construction Of Pump House, Electrical Connection, Laying Of Rising Main Line And Other Related Works.
|
Description |
Work Of Installation Of 01 New Tube Well Of 35 Hp Capacity In Ward 06 Nawada Shekhan Along With Construction Of Pump House, Electrical Connection, Laying Of Rising Main Line And Other Related Works.
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2025_DOLBU_1024964_1 |
Reference Number |
581-JK-ExEn-2024-25-1 |
Tender Fee | 5000 |
EMD | 1.49 Lakh |
Tender Value | |
Place | Jalkal Vibhag, Nagar Nigam, Bareilly |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1851450 |
Start Date | April 04, 2025 20:35 |
End Date |
11/04/2025 ( Expired 30 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Phe/swsd/ee/niet- 02 of 2025-26 (sl no 08)1st call
Sinking of big dia tube well construction of pump house erection of iron elimination plant,laying of water distribution network/rising main at vivakananda primary school ward no-03 in connection with eight 08 pin point location of the proposed de
Read moreSinking of 250 x 200 mm dia and 150 mtr deep tube well
Sinking of 250 x 200 mm dia and 150 mtr deep tube well with 200 mm pvc strainer including rising main and e-m works at ward no -17 within cooch behar municipal area
Read moreProviding, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation tube well in connection to accommodate fhtc at pump house no.-i and ii under kishorepur ground water based water
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation tube well in connection to accommodate fhtc at pump house no.-i and ii under kishorepur ground water based water
Read moreConstruction of intake well wtp and laying of raw water rising main in connection with the work augmentation of water supply to tusura town.
Construction of intake well wtp and laying of raw water rising main in connection with the work augmentation of water supply to tusura town.
Read moreRepairing inc rewinding of existing vt pump with motor sets, er main switch electrical panel boards, suction line etc and other works of 0.55 mgd capacity surface water treatment plant at kulai under dws sub-division ambassa
Repairing inc rewinding of existing vt pump with motor sets, er main switch electrical panel boards, suction line etc and other works of 0.55 mgd capacity surface water treatment plant at kulai under dws sub-division ambassa
Read moreConstruction of 04(four) nos. toilet including installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity at upgraded middle school tham under csr, dvc, tilaiya dam, t.k.division konar
Construction of 04(four) nos. toilet including installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity at upgraded middle school tham under csr, dvc, tilaiya dam, t.k.division konar
Read moreBalance work of retrofitting piped water supply scheme under jal jeevan mission at village dulhai block pichhore distt shivpuri based on tube well including installation of electric submersible water motor pump, laying and jointing distribution pipe
Balance work of retrofitting piped water supply scheme under jal jeevan mission at village dulhai block pichhore distt shivpuri based on tube well including installation of electric submersible water motor pump, laying and jointing distribution pipe
Read moreWork for rewinding of 01 no electric motor of capacity 325 hp for pump house no 3 loharu canal
Work for rewinding of 01 no electric motor of capacity 325 hp for pump house no 3 loharu canal
Read moreLine milan and stand post connection of existing tube well surrounding are of water works sector-4 residential and industrial in ward no 33 faridabad.
Line milan and stand post connection of existing tube well surrounding are of water works sector-4 residential and industrial in ward no 33 faridabad.
Read moreDrilling of 175/150 mm dia tube well and installation of submersible motor pump including electrification work/ installation complete at ward no. 59 bhairon baba mandir ke pass file no. 160/25x9/1
Drilling of 175/150 mm dia tube well and installation of submersible motor pump including electrification work/ installation complete at ward no. 59 bhairon baba mandir ke pass file no. 160/25x9/1
Read moreof your Industry type