Tender Details
Particulars | Details |
---|---|
Title |
Manalil Devaswom In Kollam Group Repairs And Maintenance To The Compound Wall Reg.(Re Etender)
|
Description |
Manalil Devaswom In Kollam Group &Amp#X0d
Repairs And Maintenance To The&Amp#X0d
Compound Wall Reg..(Re Etender)
|
Organisation | Travancore Devaswom Board | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1092 |
EMD | 11600 |
Tender Value | |
Place | Manalil Devaswom in Kollam Group- Repairs and main |
Link |
AAAAAAAAAA Login to view |
Start Date | May 13, 2025 19:30 |
End Date |
20/05/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRoad,boundary wall and drainage work at cycle park within vidyasagar industrial park, kharagpur
Compound road with drainage system and peripheral boundary wall at cycle park (20 acres) within vidyasagar industrial park, kharagpur-i in the district of paschim medinipur
Read moreDevelopment, operation and maintenance of ropeway between tawang monastery to p t tso lake in tawang district in the state of arunachal pradesh on hybrid annuity mode.
Development, operation and maintenance of
 ropeway between tawang monastery to p t
 tso lake in tawang district in the state of
 arunachal pradesh on hybrid annuity mode.
Read moreIndependent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Read moreOperation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Operation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Read moreOperation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Read moreO and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.
O and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.
Read moreCollection and transportation of municipal solid waste in wards group six pe, ps and pn ward
Collection and transportation of municipal solid waste in wards of brihanmumbai municipal corporation to&#x0d transfer stations and final disposal sites group six pe, ps and pn ward
Read moreCollection and transportation of municipal solid waste in wards group eight n s and t ward
Collection and transportation of municipal solid waste in wards of brihanmumbai municipal corporation to&#x0d transfer stations and final disposal sites group eight n s and t ward
Read moreShort term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Read moreof your Industry type