Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Construction Of Drain At Karathodu Angadi Along Link Road Between Malappuram Parappanangadi Road And Athikarathodi Kuttaloor Road General Civil Work
|
| Description |
General Construction Of Drain At Karathodu Angadi Along Link Road Between Malappuram Parappanangadi Road And Athikarathodi Kuttaloor Road General Civil Work
|
| Organisation | PWD | Chief Engineer (Roads and Bridges) | SE Roads (N) | EE Roads (MNJ) | AEE Roads SD Manjeri |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 2760 |
| EMD | 29445 |
| Tender Value | 11.78 Lakh |
| Place | Kerala |
| Link | Login to view |
| Start Date | October 05, 2026 18:00 |
| End Date |
Closing soon
13/10/2026
0 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General-annual maintenance works running contract for one year emergency andminor repair works in pwd rest house parappanangadi and thirurangadi in malappuram district.electrification
General-annual maintenance works running contract for one year emergency andminor repair works in pwd rest house parappanangadi and thirurangadi in malappuram district.electrification
Read morePrecast drain covering slab along 60m wide road between sector-2 and 3, greater noida.
Precast drain covering slab along 60m wide road between sector-2 and 3, greater noida.
Read moreGenaral-pwd rest houses maintenance contract of various rest houses in malappuram district parappanangadi kottakkal, tirur, ponnani, tirurangadi, tanur kondotty-repair works of a/c units-running contract oc split ac u nits for one year electrical ac
Genaral-pwd rest houses maintenance contract of various rest houses in malappuram district parappanangadi kottakkal, tirur, ponnani, tirurangadi, tanur kondotty-repair works of a/c units-running contract oc split ac u nits for one year electrical ac
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of service road along 130.00mtr wide peripherial road between sector-7 and 8 yeida wc-03
Construction of service road along 130.00mtr wide peripherial road between sector-7 and 8 yeida wc-03
Read moreInstallation of chain link fencing along the periphery of the project area bhep chanderkote
Installation of chain link fencing along the periphery of the project area bhep chanderkote
Read moreReconstruction of link taxiway between bay no. 05 and taxiway e and development of area between bay no. 05 and 04 at dibrugarh airport (civil and electrical works)
Reconstruction of link taxiway between bay no. 05 and taxiway e and development of area between bay no. 05 and 04 at dibrugarh airport (civil and electrical works)
Read moreConstruction work of missing link between bsa road to sanfara and ranikheda link road and 5 years maintenance work in f.y. 2026-27 in district hardoi.
Construction work of missing link between bsa road to sanfara and ranikheda link road and 5 years maintenance work in f.y. 2026-27 in district hardoi.
Read moreConstruction of link road along ibb between bp no 2270 to 2300 at govindbari and wanshapara for length of 11.945 km in the state of tripura package no tr lr g and w 2nd call
Construction of link road along ibb between bp no 2270 to 2300 at govindbari and wanshapara for length of 11.945 km in the state of tripura package no tr lr g and w 2nd call
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham
Read moreof your Industry type