Tender Details
Particulars | Details |
---|---|
Title |
Bhavnagar Division Trr(p)20.808 Tkm On Major And Important Bridges.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79707995 |
Reference Number |
199-2024-25-R |
Tender Fee | 0 |
EMD | 2.87 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79707995/viewNitPdf_4842768.pdf |
Start Date | January 23, 2025 01:09 |
End Date |
14/02/2025 ( Expired 67 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Design and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreLeakage and seepage at qtr no 10/4 66/01 67/01 and 67/03 including construction of roof on main door entrance of qtr no 66/01 and 66/02 of mt platoon estt no.22 through mes dehradun under ge (p) dehradun
Leakage and seepage at qtr no 10/4 66/01 67/01 and 67/03 including construction of roof on main door entrance of qtr no 66/01 and 66/02 of mt platoon estt no.22 through mes dehradun under ge (p) dehradun
Read moreDevelopment, operation and maintenance of ropeway between tawang monastery to p t tso lake in tawang district in the state of arunachal pradesh on hybrid annuity mode.
Development, operation and maintenance of
 ropeway between tawang monastery to p t
 tso lake in tawang district in the state of
 arunachal pradesh on hybrid annuity mode.
Read moreConstruction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117
Construction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117
Read moreRenovation of ccc building with cubicles and partitions, boundary wall, app membrane on roof top, painting and construction of cycle shed and surrounding area development at adra ccc under raghunathpur division, dist. purulia.
Renovation of ccc building with cubicles and partitions, boundary wall, app membrane on roof top, painting and construction of cycle shed and surrounding area development at adra ccc under raghunathpur division, dist. purulia.
Read morePlanning, engineering, installation, testing and commissioning of vertical lift and connecting bridges complete in all respect between peerkho to mubarak mandi complex, on engineering, procurement and construction (epc) mode.
Planning, engineering, installation, testing and commissioning of vertical lift and connecting bridges complete in all respect between peerkho to mubarak mandi complex, on engineering, procurement and construction (epc) mode.
Read moreCivil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Civil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Read moreInvestigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete
Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india
Read moreProviding installation testing and commissioning of pumping machinery along with electro mechanical components at wss rajal b of jal shakti phe mech division rajouri ut of jandk under jal jeevan mission jjm on turnkey basis
Providing installation testing and commissioning of pumping machinery along with electro mechanical components at wss rajal b of jal shakti phe mech division rajouri ut of jandk under jal jeevan mission jjm on turnkey basis
Read moreof your Industry type