Tender Details

Particulars Details
Title
Maintenance Of Rising Main Delivery Main Pipe Line Ci Di Hdpe U Pvc F.H.T.C All Related Structure Of 6 Nos Mini Pipe Water Supply Scheme Out Of 45 Nos Mini Pwss Of Binpur I Block Within Jhargram Sub Division Under Jhargram Division, Phe Dte. From 12
Description
Maintenance Of Rising Main Delivery Main Pipe Line Ci Di Hdpe U Pvc F.H.T.C All Related Structure Of 6 Nos Mini Pipe Water Supply Scheme Out Of 45 Nos Mini Pwss Of Binpur I Block Within Jhargram Sub Division Under Jhargram Division, Phe Dte. From 12
Organisation PHE | State Govt. and UT
Tender Id 2025_PHED_827155_11
Reference
Number
eNIT No.16 of AE/JSD of 2024-25
Tender Fee 0
EMD 2318
Tender Value
Place Binpur-I Block
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1841442
Start Date March 14, 2025 00:25
End Date

24/03/2025 ( Expired 68 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders

Operation and maintenance of distribution system , rising main, sluice valves, including operation of sluice valves of mougram zone-i pwss within katwa sub-division under burdwan division, phe dte period for 01.07.2025 to 30.06.2026

Read more

Operation and maintenance of ci di hdpe upvc ac gi rising main and distribution system for bodai zone-i water supply scheme for smooth supply of water through the entire command area of the scheme under barasat sub division phe dte

Read more
Repair of pumping machinery of existing 23 nos. tubewells sub. pumping sets 6 nos. horizontal pumping sets raw water and clear water and all other works contingent thereto for 12 months i.e. from after allotment under phe sub division no.4 panipat

Repair of pumping machinery of existing 23 nos. tubewells sub. pumping sets 6 nos. horizontal pumping sets raw water and clear water and all other works contingent thereto for 12 months i.e. from after allotment under phe sub division no.4 panipat

Read more
Engagement of 2 (two) nos. contractual group - d staff through agency for different official purpose for office of the executive engineer, jhargram division, phe. dte at raghunathpur, jhargram for 12 months

Engagement of 2 (two) nos. contractual group - d staff through agency for different official purpose for office of the executive engineer, jhargram division, phe. dte at raghunathpur, jhargram for 12 months

Read more
Sinking of 01 no.100mm x 50mm dia. having 6 nos. strainer upto 340 mtr depth fitted with india markii dwp hand pump tubewell with supplying pvc pipe under alipore division, phe dte at the ground of dighirpar f.p. school, g.p baharu kshetra

Sinking of 01 no.100mm x 50mm dia. having 6 nos. strainer upto 340 mtr depth fitted with india markii dwp hand pump tubewell with supplying pvc pipe under alipore division, phe dte at the ground of dighirpar f.p. school, g.p baharu kshetra

Read more
Wbphed/ae/rws/phed/niet-04 of 2025-26

Rising main and inter connection with both tube wells of bedhichandrapur pwss in udaynarayanpur block under howrah division phe dte

Read more
Balance work of pipe line with of hdpe pipe with fhtc at pratappur and kalikapur with re connection of existing fhtc and other allied works of augmentation of amlajora pwss (jjm) under rcfa division-i phe dte.

Balance work of pipe line with of hdpe pipe with fhtc at pratappur and kalikapur with re connection of existing fhtc and other allied works of augmentation of amlajora pwss (jjm) under rcfa division-i phe dte.

Read more
Annual operation and maintenance of different dia ms/di rising main and distribution system pipe line from intake site to panagarh industrial park h/w site under surface based pwss for panagarh industrial park under dwsd,phe dte (1 yr)

Annual operation and maintenance of different dia ms/di rising main and distribution system pipe line from intake site to panagarh industrial park h/w site under surface based pwss for panagarh industrial park under dwsd,phe dte (1 yr)

Read more
Maintenance of pipe line, f.h.t.c and all related structure of standalone piped water supply schemes in jhargram block under jhargram division, phe dte. for 12 months.1)standalone pwss at kismat bagihapa......19)standalone pwss at asanbani.

Maintenance of pipe line, f.h.t.c and all related structure of standalone piped water supply schemes in jhargram block under jhargram division, phe dte. for 12 months.1)standalone pwss at kismat bagihapa......19)standalone pwss at asanbani.

Read more
Laying of additional distribution pipe line for hudhudi stand alone pwss in jhargram block under jhargram division, phe dte.

Laying of additional distribution pipe line for hudhudi stand alone pwss in jhargram block under jhargram division, phe dte.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise