Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Trd Work In Connection With Proposed Cross Over Of Line 3 4 And 100 Mtr Dead End Extension Of Line 2, 5 At Kku Yard Of Jaipur Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78908277 |
Reference Number |
EL-GSU-JP-2024-25-03R-II |
Tender Fee | 0 |
EMD | 1.85 Lakh |
Tender Value | |
Place | Jaipur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78908277/viewNitPdf_4800017.pdf |
Start Date | December 09, 2024 23:15 |
End Date |
31/12/2024 ( Expired 181 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E.l.d.c.no/smii/p1/1231/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5
Selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5&#x0d
Read moreConstruction of 01 no. (gplus2) 4 unit c type building with provision of extension up to (gplus3) and its allied work at chiranjibpur colony complex under haldia area office
Construction of 01 no. (gplus2) 4 unit c type building with provision of extension up to (gplus3) and its allied work at chiranjibpur colony complex under haldia area office
Read moreE tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa
E tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa
Read moreReplacement of cooling towers installed at various underground metro stations of line 2 and 3 in dmrc network.
Replacement of cooling towers installed at various underground metro stations of line 2 and 3 in dmrc network.
Read moreHiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Hiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 350 cum at zone- 5, ward -9 and house service connection at zone -3 within buniadpur municipality under proposed water supply scheme of amrut 2.0
Construction of rcc elevated over head reservoir (intze type) of capacity 350 cum at zone- 5, ward -9 and house service connection at zone -3 within buniadpur municipality under proposed water supply scheme of amrut 2.0
Read moreSupply installation testing commissioning of 33/11 kv 1x5 mva grid substation and 33 kv line extension work at mehra under pmay gwalior file no. 160/25x3/3
Supply installation testing commissioning of 33/11 kv 1x5 mva grid substation and 33 kv line extension work at mehra under pmay gwalior file no. 160/25x3/3
Read moreAnnual repairs and maintenance of sewer line network (for 2 years) by mechanical means in sector - r3, r4, r5 at r and r pocket no.1, sector - r1, r2 at r and r pocket no.2 and sector - 1 at r and r pocket no.3 of pushpak node, navi mumbai.
Annual repairs and maintenance of sewer line network (for 2 years) by mechanical means in sector - r3, r4, r5 at r,r pocket no.1, sector - r1,r2 at r and r pocket no.2&#x0d and sector - 1 at r and r pocket no.3 of pushpak node, navi&#x0d mumbai.
Read moreCa no.cwe bly/ge (w)/39 of 2025- 2026conversion of over head line into ug cable and allied external electric work at kv no. 2 jla under ge (west) bareilly
Ca no.cwe bly/ge (w)/39 of 2025- 2026conversion of over head line into ug cable and allied external electric work at kv no. 2 jla under ge (west) bareilly
Read moreConstruction of covered cable trence with laying and installation of 350 mtr long, 5 nos 11 kv 3-phase 3 core120 sq mm xlpe underground cable in a covered cable trence from newly constructed 33 11 kv durgachowmuhani ss under ed kamalpur
Construction of covered cable trence with laying and installation of 350 mtr long, 5 nos 11 kv 3-phase 3 core120 sq mm xlpe underground cable in a covered cable trence from newly constructed 33 11 kv durgachowmuhani ss under ed kamalpur
Read moreof your Industry type