Tender Details
Particulars | Details |
---|---|
Title |
Armo At Srfti Kolkata For The Year 2025 2026 For Phase I And Ii Sub Head Day To Day Complete Building Maintenance Of Office And Residential Complex For A Period Of 12 Twelve Months
|
Description |
Armo At Srfti Kolkata For The Year 2025 2026 For Phase I And Ii Sub Head Day To Day Complete Building Maintenance Of Office And Residential Complex For A Period Of 12 Twelve Months
|
Organisation | Prasar Bharati, Broadcasting Corporation of India | Autonomous Bos |
Tender Id | 2025_PrasarBharati_26120 |
Reference Number |
SE-KOL/NIT/02/2024-25 |
Tender Fee | 0 |
EMD | 53890 |
Tender Value | |
Place | Delhi |
Link | https://prasarbharati.eproc.in |
Start Date | March 14, 2025 22:40 |
End Date |
26/03/2025 ( Expired 73 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreAnnual repair and maintenance work of residential colony of sharda power house, lohiahead for the year 2025-26
Annual repair and maintenance work of residential colony of sharda power house, lohiahead for the year 2025-26
Read moreTerm contract of repair and maintenance work of cantt fund drain for the financial year 2025-2026
Term contract of repair and maintenance work of cantt fund drain for the financial year 2025-2026
Read moreTerm contract of repair and maintenance work of cantt fund cc road/ interlocking for the financial year 2025-2026
Term contract of repair and maintenance work of cantt fund cc road/ interlocking for the financial year 2025-2026
Read moreArm of residential and non residential building at bhq bop and tc uttarakashi of 35th mahidanda uttarakashi for the year 2025 26 sh distempering painting and other work at bhq
Arm of residential and non residential building at bhq bop and tc uttarakashi of 35th mahidanda uttarakashi for the year 2025 26 sh distempering painting and other work at bhq
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreAnnual civil repairs and maintenance of kdm complex, rkoea,ongc, jodhpur for a period of three years(36 months)
Annual civil repairs and maintenance of kdm complex, rkoea,ongc, jodhpur for a period of three years(36 months)
Read moreAnnual work contract for operation and maintenance of steam boilers and softener plants in rtc hours by engaging qualified first and second class licensed boiler attendants at karp for the period of 12 months
Annual work contract for operation and maintenance of steam boilers and softener plants in rtc hours by engaging qualified first and second class licensed boiler attendants at karp for the period of 12 months
Read moreof your Industry type