Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Rewiring And Maintenance Work By Replacing Conventional Fitting By Led Energy Efficient Fitting To Apwd Type Iii Qtrs 1 2 3 And 4
|
Description |
Rewiring And Maintenance Work By Replacing Conventional Fitting By Led Energy Efficient Fitting To Apwd Type Iii Qtrs 1 2 3 And 4
|
Organisation | Government of Andaman and Nicobar Islands (U.T) |
Tender Id | 2023_APWD_10783_1 |
Reference Number |
e-tender-DB/CD/CN/2023-24/1155 |
Tender Fee | 0 |
EMD | 9929 |
Tender Value | |
Place | EE,CD,APWD, Car Nicobar |
Link | https://eprocure.andaman.gov.in |
Start Date | July 03, 2023 15:30 |
End Date |
10/07/2023 ( Expired 708 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreComprehensive annual maintenance contract (camc) for hitachi-hirel make 2x 80 kva -2 sets ups system installed at unit# 1 and 2 ( 2x 250 mw),emerson make 2x 80 kva -2 sets ups system installed at unit# 3 and 4 ( 2x 250 mw) and mini ups system for p
Comprehensive annual maintenance contract (camc) for hitachi-hirel make 2x 80 kva -2 sets ups system installed at unit# 1 and 2 ( 2x 250 mw),emerson make 2x 80 kva -2 sets ups system installed at unit# 3 and 4 ( 2x 250 mw) and mini ups system for p
Read moreStrengthening of roads in sector 1 2 3 of yojna no 1 chandausi and the adjacent road from kali mandir to matrumals dharamshala at distt sambhal under infrastructure work
Strengthening of roads in sector 1 2 3 of yojna no 1 chandausi and the adjacent road from kali mandir to matrumals dharamshala at distt sambhal under infrastructure work
Read moreProvding laying earth filling, interlocking tile 60mm, ree laynig old tile , cc 1 2 4 p fixing main hols cover and frame , road gully cover and frame, other maintenance work in malout city
Provding laying earth filling, interlocking tile 60mm, ree laynig old tile , cc 1 2 4 p fixing main hols cover and frame , road gully cover and frame, other maintenance work in malout city
Read moreImprovement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Improvement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Read moreConstruction of side drain and replacement of damaged rr masonry underneath penstock by floor concreting in between saddle 5 and 6 of anchor 1 to anchor 2 and anc 2 to saddle 3 between anchor 2 and 3 of power house vi penstock
Construction of side drain and replacement of damaged rr masonry underneath penstock by floor concreting in between saddle 5 and 6 of anchor 1 to anchor 2 and anc 2 to saddle 3 between anchor 2 and 3 of power house vi penstock
Read moreProviding of security guards and security supervisors to seven (7) joint commissioner cadre executive officer temples i.e, 1) sri varaha lakshmi narasimha swamy devasthanam, simhachalam, visakhapatnam district 2) sri veera venkata satyanarayanaswamy temple, annavaram, kakinada district 3) sri venkateswara swamy temple, dwarakatirumala, eluru district 4) sri durga malleswara swamyvarla devasthanam, vijayawada, ntr district 5) sri kalahasteeswara swamy devasthanam, srikalahasti, tirupati district
Providing of security guards and security supervisors to seven (7) joint commissioner cadre executive officer temples i.e, 1) sri varaha lakshmi narasimha swamy devasthanam, simhachalam, visakhapatnam district 2) sri veera venkata satyanarayanaswamy temple, annavaram, kakinada district 3) sri venkateswara swamy temple, dwarakatirumala, eluru district 4) sri durga malleswara swamyvarla devasthanam, vijayawada, ntr district 5) sri kalahasteeswara swamy devasthanam, srikalahasti, tirupati district 6) sri swayambu sri varasiddi vinayaka swamy devasthanam, chittoor district, kanipakam (v), irala (m) 7) sri bhramaramba mallikarjuna swamy vari devasthanam, srisailam, nandyal district for two years period.
Read moreof your Industry type