Overhauling Of Hpt Module Ip Turbine Tg Bearing Inspection And Generator Mechanical Works Of 210 Mw Unit4 At Ggsstp Ropar
Description
Overhauling Of Hpt Module Ip Turbine Tg Bearing Inspection And Generator Mechanical Works Of 210 Mw Unit4 At Ggsstp Ropar
Organisation Bharat Heavy Electricals Limited | Public Sector Undertakings
Tender Id 2025_BHEL_51042_1
Reference
Number
CHD/ROPAR-4/OH-TG/25_028
Tender Fee 0
EMD 0
Tender Value -
Place ROPAR
Link
View Original Tender Notice

https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=54874

Start Date July 24, 2025 23:30
End Date
Expired 04/08/2025

Expired 441 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Spares for hpt assembly fixtures 210 mw kwu turbine

Spares for hpt assembly fixtures 210 mw kwu turbine

Read more
Procurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.

Procurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.

Read more
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.

Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.

Read more
Reheater replacement (including its testing and commissioning) and capital overhauling of boiler for unit5 210 mw at ggsstp rupnagar

Reheater replacement (including its testing and commissioning) and capital overhauling of boiler for unit5 210 mw at ggsstp rupnagar

Read more
757/p-3/emp-13345 dt. 25.09.2026 for overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar

Overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar

Read more
Supply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x

Supply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x

Read more
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider

Read more
7837/p-3/emp-13385 dt. 14.07.26 for procurement of different type of spares for water pumps ( beacon weir make) of stage-ii and iii of ash handling system for 4x210 mw units at ggsstp ropar.

Procurement of different type of spares for water pumps ( beacon weir make) of stage-ii and iii of ash handling system for 4x210 mw units at ggsstp ropar.

Read more
Work contract for supply cum application of pad type ceramic fiber blanket insulation for hp and ip turbine modules and associated valves of 2x210 mw in unit no. 1 and 2 of ph i, sgtps, birsinghpur.

Work contract for supply cum application of pad type ceramic fiber blanket insulation for hp and ip turbine modules and associated valves of 2x210 mw in unit no. 1 and 2 of ph i, sgtps, birsinghpur.

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Read more
Click Here to Download Dockets