Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Overhauling Of Hpt Module Ip Turbine Tg Bearing Inspection And Generator Mechanical Works Of 210 Mw Unit4 At Ggsstp Ropar
|
| Description |
Overhauling Of Hpt Module Ip Turbine Tg Bearing Inspection And Generator Mechanical Works Of 210 Mw Unit4 At Ggsstp Ropar
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2025_BHEL_51042_1 |
|
Reference Number |
CHD/ROPAR-4/OH-TG/25_028 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | ROPAR |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=54874 |
| Start Date | July 24, 2025 23:30 |
| End Date |
Expired
04/08/2025
Expired 440 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares for hpt assembly fixtures 210 mw kwu turbine
Spares for hpt assembly fixtures 210 mw kwu turbine
Read moreProcurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Procurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Read moreProcurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Read moreReheater replacement (including its testing and commissioning) and capital overhauling of boiler for unit5 210 mw at ggsstp rupnagar
Reheater replacement (including its testing and commissioning) and capital overhauling of boiler for unit5 210 mw at ggsstp rupnagar
Read more757/p-3/emp-13345 dt. 25.09.2026 for overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar
Overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar
Read moreSupply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x
Supply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider
Read more7837/p-3/emp-13385 dt. 14.07.26 for procurement of different type of spares for water pumps ( beacon weir make) of stage-ii and iii of ash handling system for 4x210 mw units at ggsstp ropar.
Procurement of different type of spares for water pumps ( beacon weir make) of stage-ii and iii of ash handling system for 4x210 mw units at ggsstp ropar.
Read moreWork contract for supply cum application of pad type ceramic fiber blanket insulation for hp and ip turbine modules and associated valves of 2x210 mw in unit no. 1 and 2 of ph i, sgtps, birsinghpur.
Work contract for supply cum application of pad type ceramic fiber blanket insulation for hp and ip turbine modules and associated valves of 2x210 mw in unit no. 1 and 2 of ph i, sgtps, birsinghpur.
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreof your Industry type