Tender Details

Particulars Details
Title
Design, Fabrication, Supply And Installation Of Signage And Graphics For Six (06) Elevated Metro Stations Of Reach 6 Under Phase Ii.
Description
Design, Fabrication, Supply And Installation Of Signage And Graphics For Six (06) Elevated Metro &#X0d Stations Of Reach 6 Under Phase Ii.
Organisation Bangalore Metro Rail Corporation Limited | Public Sector Undertakings
Tender Id 2025_BMRCL_227062_1
Reference
Number
BMRCL/ELE/0502/2024
Tender Fee 11800
EMD 6.91 Lakh
Tender Value -
Place Bangalore
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=254800

Start Date March 15, 2025 16:30
End Date
Expired 20/03/2025

Expired 572 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at six 06 elevated stations

Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at six 06 elevated stations

Read more
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Read more
Construction of viaduct and elevated stations of gurugram metro rail limited

Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.

Read more
Annual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.

Annual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.

Read more
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing

Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing

Read more
Requirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc

Requirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc

Read more
Ddc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.

Ddc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.

Read more
E-tender for selection of licensee for operating parking lots at reach 2& 3 metro stations parking tender 58

E-tender for selection of licensee for operating parking lots at reach 2& 3 metro stations parking tender 58

Read more
Annual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.

Annual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.

Read more
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.

Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise