Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Fabrication, Supply And Installation Of Signage And Graphics For Six (06) Elevated Metro Stations Of Reach 6 Under Phase Ii.
|
| Description |
Design, Fabrication, Supply And Installation Of Signage And Graphics For Six (06) Elevated Metro 
Stations Of Reach 6 Under Phase Ii.
|
| Organisation | Bangalore Metro Rail Corporation Limited | Public Sector Undertakings |
| Tender Id | 2025_BMRCL_227062_1 |
|
Reference Number |
BMRCL/ELE/0502/2024 |
| Tender Fee | 11800 |
| EMD | 6.91 Lakh |
| Tender Value | - |
| Place | Bangalore |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=254800 |
| Start Date | March 15, 2025 16:30 |
| End Date |
Expired
20/03/2025
Expired 572 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at six 06 elevated stations
Architectural finishing including design fabrication supply erection and roof sheeting of peb structures and design and construction of external facade water supply sanitary installation drainage site development works at six 06 elevated stations
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreConstruction of viaduct and elevated stations of gurugram metro rail limited
Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.
Read moreAnnual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Annual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Read moreDesign and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Read moreRequirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc
Requirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc
Read moreDdc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Ddc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Read moreE-tender for selection of licensee for operating parking lots at reach 2& 3 metro stations parking tender 58
E-tender for selection of licensee for operating parking lots at reach 2& 3 metro stations parking tender 58
Read moreAnnual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Annual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Read morePart design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Read moreof your Industry type