Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling And Withdrawal Of Old And Damaged Mother(impact) Plate And Fabrication And Fitting Mother(impact) Plate At Feeder Breaker No 1 Of Kessurgarh Abocp Mine Under Block Ii Area
|
Description |
Dismantling And Withdrawal Of Old And Damaged Mother(impact) Plate And Fabrication And Fitting Mother(impact) Plate At Feeder Breaker No 1 Of Kessurgarh Abocp Mine Under Block Ii Area
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_335517_1 |
Reference Number |
GM/B-II/AM (ENM)/E-TENDER/2025-26/024 dt 03.05.25 |
Tender Fee | 0 |
EMD | 4200 |
Tender Value | |
Place | ABOCP Mine, Block-II Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347803 |
Start Date | May 16, 2025 14:30 |
End Date |
26/05/2025 ( Expired 35 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreAAAAAAAAAA
Login to viewRehabilitation and restoration of tarafeni barrage and its appurtenant structures civil, electro-mechanical and instrumentation part under kangsabati project in right bank canal system at mouza and village baistampur, block binpur ii, p.s. belpahari
Read moreCa no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreDemolition of existing rcc buildings such as painting hangar toilet block removal of existing old roof sheets acs and other structure bulows providing area for parking metro cars with covered roofing at eastern side of tatra hangar for parking area
Demolition of existing rcc buildings such as painting hangar toilet block removal of existing old roof sheets acs and other structure bulows providing area for parking metro cars
 with covered roofing at eastern side of tatra hangar for parking area
Read moreSubstation package ss-01 (i) 1 no. 220kv line bay at bikaner-iii ps for interconnection of 300mw regs of m-s deshraj solar energy pvt. ltd. (dsepl). (ii) 1 no. of 400 kv line bay at 765/400/220 kv bikaner-iii ps for interconnection of 1000mw rppd of m-s mrs buildvision pvt. ltd. (mbpl) and 400 kv bus extension work
765/400/220 kv ais extension package - substation package ss-01 (i) 1 no. 220kv line bay at bikaner-iii ps for interconnection of 300mw regs of m-s deshraj solar energy pvt. ltd. (dsepl). (ii) 1 no. of 400 kv line bay at 765/400/220 kv bikaner-iii ps for interconnection of 1000mw rppd of m-s mrs buildvision pvt. ltd. (mbpl) and 400 kv bus extension work
Read moreInstallation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of kalika garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Installation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of kalika garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Read moreInstallation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of ekta garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Installation and re-fixing of new paver block, inserting of beem, maintenance and other civil work of ekta garden situated at scheme no. 136 a-2 under ward no. 34 zone no.07
Read moreInstallation and re-fixing of new paver block, inserting of beem, construction of kund and other civil work of maharana pratap garden situated at scheme no. 114 part-1 under ward no. 34 zone no.07
Installation and re-fixing of new paver block, inserting of beem, construction of kund and other civil work of maharana pratap garden situated at scheme no. 114 part-1 under ward no. 34 zone no.07
Read moreSpl repair to bldg no 1-8-3, provn of 01 x night picket room with attached bathroom and wc room at mt and addn-altn to 02 barrack and bathroom in otm 20 of 66 mtn bde under ge (north) binnaguri
Spl repair to bldg no 1-8-3, provn of 01 x night picket room with attached bathroom and wc room at mt and addn-altn to 02 barrack and bathroom in otm 20
 of 66 mtn bde under ge (north) binnaguri
Read moreSpl repair to bldg no 01-04-04 (bn store) and provn of hard standing and overhead shed for 03 x squad post (15x10) mtr at trg are adjacent to block no 01-04-05 sahi block under ge (north) binnaguri
Spl repair to bldg no 01-04-04 (bn store) and provn of hard standing and overhead shed for 03 x squad post (15x10) mtr at trg are adjacent to block no 01-04-05 sahi block under ge (north) binnaguri
Read moreof your Industry type