Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cridp 2023 24 (Roller Crash Barrier)
|
| Description |
Providing Roller Crash Barrier In Hairpin Bend 28 To 29 In The State Highways Roads Of Valparai H C And M Sub Division Cbe 082
|
| Organisation | Highways | State Govt. and UT |
| Tender Id | 2024_HWAY_414971_1 |
|
Reference Number |
082 - Roller Crash Barrier |
| Tender Fee | 0 |
| EMD | 89000 |
| Tender Value | - |
| Place | Pollachi |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=493730 |
| Start Date | February 07, 2024 20:30 |
| End Date |
Expired
19/02/2024
Expired 946 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreHiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area
Hiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreCridp 2023-24 (roller crash barrier)
Providing roller crash barrier in hairpin bend 20 to 23 in the state highways roads of valparai h c and m sub division cbe 084
Read moreCridp 2023-24 (roller crash barrier)
Providing roller crash barrier in hairpin bend 24 to 27 in the state highways roads of valparai h c and m sub division cbe 078
Read moreCridp 2023-24 (roller crash barrier)
Providing roller crash barrier in the major district roads of udhagamandalam h c and m sub division cbe 077
Read moreCridp 2023-24 (roller crash barrier)
Providing roller crash barrier in hairpin bend 9 to 19 in the state highways roads of valparai h c and m sub division cbe 080
Read moreCridp 2023-24 (roller crash barrier)
Providing roller crash barrier in the major district roads of udhagamandalam h c and m sub division and kothagiri h c and m sub division cbe 083
Read moreCridp 2023-24 (roller crash barrier)
Providing roller crash barrier in hairpin bend 1 to 8 in the state highways roads of valparai h c and m sub division cbe 076
Read moreCridp 2023-24 (roller crash barrier)
Providing roller crash barrier in the state highways roads of gudalur h c and m sub division cbe 091
Read moreof your Industry type