| Title |
Inspection , Load Testing And Certification Of Lifting Machines/Hoists/Tools At 500 Tpd Methanol Plantof Assam Petro Chemicals Limited
|
| Description |
Inspection , Load Testing And Certification Of Lifting Machines/Hoists/Tools At 500 Tpd Methanol Plantof Assam Petro Chemicals Limited
|
| Organisation | Industries and Commerce Department | State Govt. and UT |
| Tender Id | 2025_ICD_43179_1 |
|
Reference Number |
APL/CnP/500TPD/Mech/24-25/408 |
| Tender Fee | 10 |
| EMD | 0 |
| Tender Value | - |
| Place | Namrup |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=69011 |
| Start Date | February 28, 2025 21:30 |
| End Date |
Expired
19/03/2025
Expired 576 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing work of 100 tpd methanol and 125 tpd formalin plant road
Repairing work of 100 tpd methanol and 125 tpd formalin plant road
Read moreRepairing work of 100 tpd methanol and 125 tpd formalin plant road
Repairing work of 100 tpd methanol and 125 tpd formalin plant road
Read moreInspection and supervision works against damaged refractory linings and refractory materials inside reformer of 500 tpd methanol plant in apl
Inspection and supervision works against damaged refractory linings and refractory materials inside reformer of 500 tpd methanol plant in apl
Read moreUm/stat/qtn/001/26-27 statutory load testing and certification of cranes, lifting tools and tackles, and pressure vessels
Statutory load testing and certification of cranes, lifting tools and tackles, and pressure vessels
Read moreWitnessing and certification of load test for lifting and deck equipments on orv sagar kanya
Witnessing and certification of load test for lifting and deck equipments on orv sagar kanya
Read moreMtps i mill plant unit ii overhauling load testing and certifying of lifting tools and movable trolleys
Mtps i mill plant unit ii overhauling load testing and certifying of lifting tools and movable trolleys
Read moreInsitu five yearly servicing of lifeboats inspection testing overhauling and certification launching appliances and on load release gear installed at offshore installations of ongc
Insitu five yearly servicing of lifeboats inspection testing overhauling and certification launching appliances and on load release gear installed at offshore installations of ongc
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreof your Industry type