Tender Details

Particulars Details
Title
Balance Work Of Road From Dak Bunglow Mendhar To Golad Upto Behrote Balakote Km 7th To Km 9th Rd 500
Description
Balance Work Of Road From Dak Bunglow Mendhar To Golad Upto Behrote Balakote Km 7th To Km 9th Rd 500
Organisation PWD | State Govt. and UT
Tender Id 2024_PWDJK_255100_1
Reference
Number
e-NIT No.05/2024-25 Dated 02-08-2024
Tender Fee 6000
EMD 3.09 Lakh
Tender Value
Place Poonch
Link
View Original Tender Notice

https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=742138

Start Date August 02, 2024 23:30
End Date
Expired 16/08/2024

Expired 660 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank

Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank

Read more
Imp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26

Imp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26

Read more
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.

One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.

Read more
Internal and banks/service road clerance of malapur minor from rd 0 to 12135

Internal and banks/service road clerance of malapur minor from rd 0 to 12135

Read more
Construction of road from rd road to banpadar road in the district of koraput under mmsy for the year 2026-27

Construction of road from rd road to banpadar road in the district of koraput under mmsy for the year 2026-27

Read more
Construction and maintenance of road l086-km 9th kharangal chounri road to luddu pain package no. jk04-4562, pmgsy-iv, batch-i of 2026-27, block-gandoh, district doda (using waste plastics length-3.400 kms) length 3.400 kms

Construction and maintenance of road l086-km 9th kharangal chounri road to luddu pain package no. jk04-4562, pmgsy-iv, batch-i of 2026-27, block-gandoh, district doda (using waste plastics length-3.400 kms) length 3.400 kms

Read more
Internal and jungle clearance (bank and service road) of prabhuwala minor from rd 0 to 11535 tail

Internal and jungle clearance (bank and service road) of prabhuwala minor from rd 0 to 11535 tail

Read more
Construction and maintenance of road from l037-(link road) kohag to kudetar via dallian road rd 6.200 to tumbu package no. jk07-4521, pmgsy-iv, batch-i of 2026-27, block-duggain, district kathua (using waste plastics length 4.000 kms) length 4.000 km

Construction and maintenance of road from l037-(link road) kohag to kudetar via dallian road rd 6.200 to tumbu package no. jk07-4521, pmgsy-iv, batch-i of 2026-27, block-duggain, district kathua (using waste plastics length 4.000 kms) length 4.000 km

Read more
Anti erosion work from km. 7.550 to km. 7.800 of bokta barwar bund on the right bank of river rapti in district gorakhpur

Anti erosion work from km. 7.550 to km. 7.800 of bokta barwar bund on the right bank of river rapti in district gorakhpur

Read more
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar

Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise