Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Supply, Erection, Testing & Commissioning Of Traction Sub Stations (Scott/V
Connected) With Associated Switching Posts (Sp/Ssp) For 2 X 25 Kv Feeding System Along With Provision Of Associated Scada System In Upgradation Of Electric Traction System From 1x25 Kv To 2x25 Kv Traction System For Kumandih Garhwa Section Of Ecr To Meet 3000 Mt Loading Target.
|
| Description |
Design, Supply, Erection, Testing & Commissioning Of Traction Sub Stations (Scott/V
Connected) With Associated Switching Posts (Sp/Ssp) For 2 X 25 Kv Feeding System Along With Provision Of Associated Scada System In Upgradation Of Electric Traction System From 1x25 Kv To 2x25 Kv Traction System For Kumandih Garhwa Section Of Ecr To Meet 3000 Mt Loading Target.
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | July 03, 2026 23:21 |
| End Date |
Open
31/10/2026
16 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, erection, testing & commissioning of 132kv/2x25kv traction sub stations (scott connected transformer) with associated switching posts for 2 x 25 kv at feeding system & scada in jaipur - sawaimadhopur section of jaipur division of north western railway.
Design, supply, erection, testing & commissioning of 132kv/2x25kv traction sub stations (scott connected transformer) with associated switching posts for 2 x 25 kv at feeding system & scada in jaipur - sawaimadhopur section of jaipur division of north western railway.
Read moreDesign, supply, erection, testing and commissioning for upgradation of electric traction system from 1x25kv to 2x25kv traction system for ranchi(excl.)-bondamunda-bimalgarh-kiriburu(incl.) & barsuan(incl.) section of ranchi and chakradharpur division of south eastern railway to meet 3000 mt loading target.
Design, supply, erection, testing and commissioning for upgradation of electric traction system from 1x25kv to 2x25kv traction system for ranchi(excl.)-bondamunda-bimalgarh-kiriburu(incl.) & barsuan(incl.) section of ranchi and chakradharpur division of south eastern railway to meet 3000 mt loading target.
Read moreDesign/modification, supply, erection, testing and commissioning of 132kv/2x25 kv scott connected traction sub station and switching posts with at between et to knw section of bhopal division of w c railway to meet 3000mt loading target.
Design/modification, supply, erection, testing and commissioning of 132kv/2x25 kv scott connected traction sub station and switching posts with at between et to knw section of bhopal division of w c railway to meet 3000mt loading target.
Read moreComprehensive, preventive and breakdown maintenance for 12 months of scada remote terminal units (rtus) at traction sub stations, feeding posts & switching posts (tss/fp/sp/ssp) comprising with equipments in panki-ddu section of prayagraj division of north central railway
Comprehensive, preventive and breakdown maintenance for 12 months of scada remote terminal units (rtus) at traction sub stations, feeding posts & switching posts (tss/fp/sp/ssp) comprising with equipments in panki-ddu section of prayagraj division of north central railway
Read moreDesign, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Design, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Read moreDesign, supply, erection, testing & commissioning of 2x25kv, 50hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm contact wire, lt supply transformer stations including modifications to the existing ohe in view of proposed doubling between alamapur road -dupadu section with associated yard modifications on mahabubnagar-dhone section & modification of 1x25 kv sp at kotla to suit double line in hyderabad division of southcentral railway
Design, supply, erection, testing & commissioning of 2x25kv, 50hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm contact wire, lt supply transformer stations including modifications to the existing ohe in view of proposed doubling between alamapur road -dupadu section with associated yard modifications on mahabubnagar-dhone section & modification of 1x25 kv sp at kotla to suit double line in hyderabad division of southcentral railway
Read moreSurvey/route plan/design/drawings of 132 kv eht lines from grid sub station to traction substations, survey/design/ drawing of eht line crossings infringing proposed railway track & associated ohe works, wiring diagram, general power supply diagram, sectioning diagram and pegging plans related to ohe work, tss/sp/ssp location plans surveys and ohe/psi design & drawing of section for new line/ doubling projects ( nke-rxl-smi & mfp-smi, mansi-khagaria,goldenganj-katihar etc.) over
Survey/route plan/design/drawings of 132 kv eht lines from grid sub station to traction substations, survey/design/ drawing of eht line crossings infringing proposed railway track & associated ohe works, wiring diagram, general power supply diagram, sectioning diagram and pegging plans related to ohe work, tss/sp/ssp location plans surveys and ohe/psi design & drawing of section for new line/ doubling projects ( nke-rxl-smi & mfp-smi, mansi-khagaria,goldenganj-katihar etc.) over
Read moreDesign, supply, erection, testing and commissioning of 132/55kv scott connected traction substation and switching posts for 2x25kv feeding system between godhra-ratlam section of ratlam division of western railway.
For complete deion and other details, please refer to tender
Read moreDesign, supply, erection, testing & commissioning of traction substation (01 no. at hilsa) with associated switching station posts ( 02 no s sp & 02 no s ssp) for 1x25kv electric traction feeding system in connection with construction of new bg line from neora to daniawan& brb-shk section in danapur division of east central railway in bihar, india
For complete deion and other details, please refer to tender
Read moreDesign, supply, erection, testing and commissioning of 220/132/55kv scott connected traction substation and switching posts for 2x25kv at feeding system between udhana-jalgaon section of mumbai division of western railway in connection of work to meet 3000 mt loading target
For complete deion and other details, please refer to tender
Read moreof your Industry type