Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Nhidcl/Imphal/Stmc/Fc/25 26
|
Description |
Short Term Improvement And Routine Maintenance Of Finch Corner Kaziphung Ukhrul Road Section Of Nh 202 From Existing Km 522.860 To Km 538.730 Total Length 15.87 Km Pkg 03 In The State Of Manipur On Item Rate Basis In The Fy 25 26
|
Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
Tender Id | 2025_NHIDC_859187_1 |
Reference Number |
NHIDCL/Imphal/STMC/FC/25-26 |
Tender Fee | 11800 |
EMD | 2.49 Lakh |
Tender Value | |
Place | RO-Imphal |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=903279 |
Start Date | May 08, 2025 17:00 |
End Date |
20/05/2025 ( Expired 49 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreReconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis
Reconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis
Read moreMajor maintenance through strengthening overlay of the existing highway from km.103.050 (athur) to km.119.800 (salavathi) on tambaram to tindivanam section of nh-32 (nh-45) in the state of tamil nadu on item rate (percentage) basis
Major maintenance through strengthening overlay of the existing highway from km.103.050 (athur) to km.119.800 (salavathi) on tambaram to tindivanam section of nh-32 (nh-45) in the state of tamil nadu on item rate (percentage) basis
Read moreRehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreAnnual maintenance including incident management of two laning with paved shoulder of dindigul-theni-kumili section from km 2.750 to km 136.543 of nh-183 in the state of tamil nadu on item rate basis
Annual maintenance including incident management of two laning with paved shoulder of dindigul-theni-kumili section from km 2.750 to km 136.543 of nh-183 in the state of tamil nadu on item rate basis
Read moreShort term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma
Short term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreRoutine maintenance including incident management (excluding ambulance services) and safety improvements for nellore bypass (4l length of 14.668 km) section of nh-16 and badvel to chunchuluru section (2l length 23.645 km) of nh-67 in the state of ap.
Routine maintenance including incident management (excluding ambulance services) and safety improvements for nellore bypass (4l length of 14.668 km) section of nh-16 and badvel to chunchuluru section (2l length 23.645 km) of nh-67 in the state of ap.
Read moreof your Industry type