Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Protection Work Just Downstream Of Solid Rcc Apron With Block Protection And Loose Stone Apron Methods And Providing Rcc Retaining Wall Along The Banks Of River Khandepar To Guide The River Flow Axially Through Opa Barrage At Opa Of Ponda Taluka.
|
| Description |
Protection Work Just Downstream Of Solid Rcc Apron With Block Protection And Loose Stone Apron Methods And Providing Rcc Retaining Wall Along The Banks Of River Khandepar To Guide The River Flow Axially Through Opa Barrage At Opa Of Ponda Taluka.
|
| Organisation | WATER RESOURCE DEPARTMENT | State Govt. and UT |
| Tender Id | 2025_WRD_20358_1 |
|
Reference Number |
10/24-25/ACT/WDIII/WRD/725/s1 |
| Tender Fee | 26000 |
| EMD | 10.19 Lakh |
| Tender Value | |
| Place | Ponda |
| Link |
View Original Tender Notice
https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=20792 |
| Start Date | February 27, 2025 23:00 |
| End Date |
Expired
14/03/2025
Expired 459 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall at mhalshe along the banks of nallah to avoid erosion potential flooding issues in ward no 5 v p curti khandepar in ponda taluka.
Construction of retaining wall at mhalshe along the banks of nallah to avoid erosion potential flooding issues in ward no 5 v p curti khandepar in ponda taluka.
Read moreRepairs to the kapileshwari nallah retaining wall downstream of velop culvert at kapileshwari in ponda taluka
Repairs to the kapileshwari nallah retaining wall downstream of velop culvert at kapileshwari in ponda taluka
Read moreDesilting of khandepar river 300 m upstream and downstream of intersection of udnai river along with desilting of nallah joining udnai river at dabal bridge in nirancal village of ponda taluka to overcome inundation flooding durning heavy monsoon.
Desilting of khandepar river 300 m upstream and downstream of intersection of udnai river along with desilting of nallah joining udnai river dabal bridge in nirancal village of ponda taluka to overcome inundation flooding during heavy monsoon.
Read moreImprovement to the retaining wall of existing nallah behind sairaj apartment at haveli curti in ward no ix in vp curti khandepar of ponda taluka.
Improvement to the retaining wall of existing nallah behind sairaj apartment at haveli curti in ward no ix in vp curti khandepar of ponda taluka.
Read moreConstruction of protection wall to the banks of nallah at vizar band in v.p. panchawadi of shiroda constituency of ponda taluka.
Construction of protection wall to the banks of nallah at vizar band in v.p. panchawadi of shiroda constituency of ponda taluka.
Read moreConstruction of upstream and downstream curtain wall concrete and stone appron for protection of end weir of kanhan river project kochi barrage tq saoner dist nagpur
Construction of upstream and downstream curtain wall concrete and stone appron for protection of end weir of kanhan river project kochi barrage tq saoner dist nagpur
Read moreConstruction of flood protection wall along right margin of krishna river on the downstream of prakasam barrage from km 0.900 to km 2.610 in tadepalli village and mandal in guntur district
Construction of flood protection wall along the right margin of krishna river on the downstream of prakasam barrage from km 0.900 to km 2.610 in tadepalli village mandal in guntur district
Read moreConstruction of foot bridge across nallah tributary over banks including strengthening and beautifying the guide walls along nallah on either side rejuvenation of fresh water bos at upper bazaar behind market complex ponda taluka ponda
Construction of foot bridge across nallah tributary over banks including strengthening and beautifying the guide walls along nallah on either side rejuvenation of fresh water bos at upper bazaar behind market complex ponda taluka ponda
Read moreConstruction of retaining wall along the kunjan odai from sembiyapalayam road culvert downstream to river guduvaiyar confluence point at sembiyapalayam in villianur commune, puducherry.
Construction of retaining wall along the kunjan odai from sembiyapalayam road culvert downstream to river guduvaiyar confluence point at sembiyapalayam in villianur commune, puducherry.
Read moreZone no. 18 ward no. 63 construction of retaining wall along the banks of kanh river, from shankarbagh dam to anaaj mandi bridge.(second call)
Zone no. 18 ward no. 63 construction of retaining wall along the banks of kanh river, from shankarbagh dam to anaaj mandi bridge.(second call)
Read moreof your Industry type