Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling , Transportation And Installation Of Track Line (32lbs) In Cm Panel Of Vii Seam At Bangwar Ug Mine,Of Sohagpur Area
|
| Description |
Dismantling , Transportation And Installation Of Track Line (32lbs) In Cm Panel Of Vii Seam At Bangwar Ug Mine,Of Sohagpur Area
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_SECL_282692_1 |
|
Reference Number |
SECL/SGP/ET/23-24/622 dt30/06/2023 |
| Tender Fee | - |
| EMD | 10000 |
| Tender Value | - |
| Place | Office of the Staff Officer (Mining) |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | July 03, 2023 15:30 |
| End Date |
Expired
13/07/2023
Expired 1190 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Maintenance of belt conveyor for cm panel of 10b(top) seam at haldibari ug mine.
Read moreConstruction of side protection wall and construction of 245 nos. steps for cm panel of 10b seam at haldibari ug mine.
Construction of side protection wall and construction of 245 nos. steps for cm panel of 10b seam at haldibari ug mine.
Read moreConstruction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Construction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Read moreCleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Cleaning of intermediate -65l sump and -92l sump in 4a seam at jhiria ug mine of hasdeo area.
Read moreConstruction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Construction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Read moreDrivage of 1 no. underground vertical air shaft from seam-iii to seam-i to establish return airway system for vijay west ug mine at rani atari sub area
Drivage of 1 no. underground vertical air shaft from seam-iii to seam-i to establish return airway system for vijay west ug mine at rani atari sub area
Read morePreparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Read moreConstruction of permanent first aid station,cross over bridge in every 300m interval for safety cross the belt in v-top seam at baherabandh ug mine, hasdeo area.
Construction of permanent first aid station,cross over bridge in every 300m interval for safety cross the belt in v-top seam at baherabandh ug mine, hasdeo area.
Read moreConstruction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Construction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Read moreConstruction of 3nos. air-crossing (including build-ing material) (at location 2d/54le, 2d/55le and 2d/56le) in cm panel e7 of bagdona seam at tawa mine of pathakhera area, wcl
Construction of 3nos. air-crossing (including build-ing material) (at location 2d/54le, 2d/55le and 2d/56le) in cm panel e7 of bagdona seam at tawa mine of pathakhera area, wcl
Read moreof your Industry type