Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Comprehensive Contract For Operation And Maintenance Of 2 Mld Sewage Treatment Plant For Three Years At Kalundre Node Under Panvel Municipal Corporation Area.
|
| Description |
As Per Tender
|
| Organisation | Panvel Municipal Corporation | State Govt. and UT |
| Tender Id | 2024_PMC_1000582_1 |
|
Reference Number |
PMC/SEWERAGE/70/2023-24 |
| Tender Fee | 2360 |
| EMD | 1.5 Lakh |
| Tender Value | - |
| Place | PMC Area |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1748843 |
| Start Date | February 09, 2024 00:25 |
| End Date |
Expired
22/02/2024
Expired 964 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation
Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation
Read moreConstruction of treated sewage pumping station, drain outfall for disposal of treated sewage from 9 mld stp and o&m of above work for 15 years at naugachiya.
Construction of treated sewage pumping station, drain outfall for disposal of treated sewage from 9 mld stp and o&m of above work for 15 years at naugachiya.
Read moreConstruction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.
Construction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.
Read moreCanal water based water supply project for construction of 12.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance at rampura phul, district bathinda, punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 12.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance at rampura phul, district bathinda, punjab under amrut 2.0 scheme
Read moreManning,operation and maintenance of ph-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii peddapur, transmission division-ii, patancheru.
Manning,operation and maintenance of ph-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii peddapur, transmission division-ii, patancheru.
Read moreAward of contract for comprehensive amc for air conditioner system on 500 tph feeder breaker operator cabin at kkocp, mm area for a period of three (03) years.
Award of contract for comprehensive amc for air conditioner system on 500 tph feeder breaker operator cabin at kkocp, mm area for a period of three (03) years.
Read moreComprehensive house keeping, operation and maintenance services contract (for 3 years) for urja auditorium building along with entire amenities and campus at bsphcl colony, punaichak , patna, bihar.
Comprehensive house keeping, operation and maintenance services contract (for 3 years) for urja auditorium building along with entire amenities and campus at bsphcl colony, punaichak , patna, bihar.
Read moreOperation and maintenance of kslisp stage-i pumping station at nagireddypally (v), narva (m) and stage-ii pumping station at teelair (v), marikal (m), narayanpet district for the period of three years from 11.11.2026 to 10.11.2029.
Operation and maintenance of kslisp stage-i pumping station at nagireddypally (v), narva (m) and stage-ii pumping station at teelair (v), marikal (m), narayanpet district for the period of three years from 11.11.2026 to 10.11.2029.
Read moreManjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Manjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Read moreComprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Read moreof your Industry type