Tender Details

About Tender

πŸ—οΈ Invitation For Bids: Masonry Boundary Wall Construction At Alipore Avenue 🧱🚧 Syama Prasad Mookerjee Port Kolkata (Spm Port), An Autonomous Body, Is Seeking Bids From Experienced Contractors For The Construction Of A Masonry Boundary Wall To Secure The Boat Canal Plot On Alipore Avenue. πŸ“ πŸ” Project Scope: The Work Includes Closing Existing Open Gaps At The Boat Canal Plot And Securing Adjacent Areas Along The Allied Work Within South Section Smp. πŸ“… Bid Submission Deadline: July 11, 2024, 3:00 Pm πŸ’Έ Tender Fee: Inr 590 πŸ’° Earnest Money Deposit (Emd): Inr 11400 Interested Bidders Must Submit Detailed Proposals, Including Cost Estimates, Construction Methodology, And Timelines, Adhering To The Specifications Outlined In The Tender Document. Keywords: Construction, Masonry Boundary Wall, Spm Port, Alipore Avenue, Kolkata Port Trust, Civil Engineering, Tender, Bid Submission, Emd, Earnest Money Deposit
Particulars Details
Title
Construction Of Masonary Boundary Wall To Close Existing Open Gaps At Boat Canal Plot On Alipore Avenue
Description
Construction Of Masonary Boundary Wall To Close Existing Open Gaps At Boat Canal Plot On Alipore Avenue (Erstwhile Baily Bridge Access) And To Secure Other Adjacent Other Areas Along The Allied Work Under South Section Smp
Organisation Syama Prasad Mookerjee Port Kolkata | Autonomous Bos
Tender Id 1466
Reference
Number
PI234B029
Tender Fee 590
EMD 11400
Tender Value
Place Kolkata Port Trust-Kolkata Dock System-KDS-Civil Engineering-West Bengal-Kolkata
Link https://kopt.enivida.in/
Start Date June 19, 2024 00:21
End Date

11/07/2024 ( Expired 331 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh

Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Read more
Construction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex

Construction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex

Read more
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.

Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.

Read more
Construction of buttress wall at the toe of existing waste dump of 14 mnz ml 1066 mb 150 mtr length at dep 11c biom kirandul complex

Construction of buttress wall at the toe of existing waste dump of 14 mnz ml 1066 mb 150 mtr length at dep 11c biom kirandul complex

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise