Tender Details
Particulars | Details |
---|---|
Title |
Providing Laying Testing And Commissioning Of Di Ss K9 Pipe In Raw Water Rising Main And Water Supply Distribution System Of Podabahal Industrialpark Sundergarh
|
Description |
Providing Laying Testing And Commissioning Of Di Ss K9 Pipe In Raw Water Rising Main And Water Supply Distribution System Of Podabahal Industrialpark Sundergarh
|
Organisation | IDCO | State Govt. and UT |
Tender Id | 2024_IDCO_108384_1 |
Reference Number |
PC/ EST/ E - 31 /2024-25 |
Tender Fee | 11800 |
EMD | 3.67 Lakh |
Tender Value | |
Place | Podabahala Sundargarh |
Link | https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=520790 |
Start Date | December 17, 2024 14:40 |
End Date |
31/12/2024 ( Expired 134 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreSupply, installation, testing and commissioning of air conditioning and ventilation of rup plant exhaust system at frfcf, kalpakkam
Supply, installation, testing and commissioning of air conditioning and ventilation of rup plant exhaust system at frfcf, kalpakkam
Read moreDesign, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreInstallation and commissioning of ash water recovery system under capex 2025 2026
Installation and commissioning of ash water recovery system under capex 2025 2026
Read moreSupply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreSupply, installation and commissioning of a multiaxis cnc system and fibre laser wobble welding head with accessories
Supply, installation and commissioning of a multiaxis cnc system and fibre laser wobble welding head with accessories
Read moreSupply, installation, commissioning and demonstration of protein purification system
Supply, installation, commissioning and demonstration of protein purification system
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreof your Industry type