Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Grassing Over The Ob Dump At Rajpura Ocp Under Mugma Area
|
| Description |
Grassing Over The Ob Dump At Rajpura Ocp Under Mugma Area
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_328399_1 |
|
Reference Number |
ECL/GM/MA/CE/24-25/eTender/462 Dt. 08.02.2025 |
| Tender Fee | 0 |
| EMD | 16000 |
| Tender Value | - |
| Place | ROCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340404 |
| Start Date | February 11, 2025 19:30 |
| End Date |
Expired
21/02/2025
Expired 601 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Job1 miscellaneous job requirement related to maintenance and operation of pump and replacement of defective motor at rajpura ocp mugma area ecl job2 miscellaneous job requirement related to maintenance and operation of pump at rajpura ocp mugma are
Job1 miscellaneous job requirement related to maintenance and operation of pump and replacement of defective motor at rajpura ocp mugma area ecl job2 miscellaneous job requirement related to maintenance and operation of pump at rajpura ocp mugma are
Read moreJob1 repairing servicing of kirloskar make dsm3 pump 500gpm and other miscellaneous workshop related job, rajpura ocp job2 repairing servicing of maxflow make pump 1000gpm rajpura ocp mugma area, ecl
Job1 repairing servicing of kirloskar make dsm3 pump 500gpm and other miscellaneous workshop related job, rajpura ocp job2 repairing servicing of maxflow make pump 1000gpm rajpura ocp mugma area, ecl
Read more(a) diversion of 550v over head line at mla colony (out site of pit limit) (b) diversion of 3.3 kv over head line (3.3 pump side) at nirsa ocp, mugma area.
(a) diversion of 550v over head line at mla colony (out site of pit limit) (b) diversion of 3.3 kv over head line (3.3 pump side) at nirsa ocp, mugma area.
Read moreRepairing of be1000 shovels sl no 10240 and 10272 deployed at barmuri ocp mugma area
Repairing replacement of undercarriage assemblies in beml be1000 excavators sl no 10240 and 10272 deployed at barmuri ocp mugma area
Read moreHandling ,transport and other mining services - percentage quote based - ob removal, coal extraction, handling & transport service, hiring of hemm for ob removal coal extraction loading transportation mobile crusher, chhal ocp raigarh area
Handling ,transport and other mining services - percentage quote based - ob removal, coal extraction, handling & transport service, hiring of hemm for ob removal coal extraction loading transportation mobile crusher, chhal ocp raigarh area
Read moreReplacement of undercarriage and new hole making in lh sprocket boss of beml dozer sl no 13494 deployed at barmuri ocp mugma area
Replacement of undercarriage and new hole making in lh sprocket boss of beml dozer sl no 13494 deployed at barmuri ocp mugma area
Read moreConstruction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreRepairing of cls system, cracked dump body and auto electric system in equipment no. bh60m dumper sl. no. 60777/d13140 at jharkhand ocp
Repairing of cls system, cracked dump body and auto electric system in equipment no. bh60m dumper sl. no. 60777/d13140 at jharkhand ocp
Read moreSelection of agency for conversion of over - burden (ob) to m-sand of trans damodar coal mine in bankura district of west bengal
Selection of agency for conversion of over - burden (ob) to m-sand of trans damodar coal mine in bankura district of west bengal
Read moreof your Industry type