Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Assessment Of Health Condition And Suggesting Rehabilitation Measures For Existing Berth Nos 1, 2, 13 And 14 At N.S Dock, Smpk.
|
| Description |
Consultancy Services For Assessment Of Health Condition And Suggesting
Rehabilitation Measures For Existing Berth Nos 1, 2, 13 And 14 At N.S Dock,
Smpk.
|
| Organisation | Kolkata Port Trust | Central Govt. Ministry/Department |
| Tender Id | 2024_KoPT_828288_1 |
|
Reference Number |
SMPK/KDS/CIV/T/2890/72 |
| Tender Fee | 2950 |
| EMD | 1.5 Lakh |
| Tender Value | |
| Place | Under NS Docks |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=870453 |
| Start Date | October 08, 2024 19:30 |
| End Date |
Expired
22/10/2024
Expired 605 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of paver block topped hard stand at l-3 plot and rehabilitation of plot adjacent to tata shed behind berth no.13 at hdc, haldia
Development of paver block topped hard stand at l-3 plot and rehabilitation of plot adjacent to tata shed behind berth no.13 at hdc, haldia
Read moreRepair and protection of rcc structures of 3 nos. cooling towers ofstage-i -unit 1 - 2 - 3 at ntpc ramagundam
Repair and protection of rcc structures of 3 nos. cooling towers ofstage-i -unit 1 - 2 - 3 at ntpc ramagundam
Read moreConstruction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Construction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Read moreOutsourcing of track maintenance services of operational assets of ballastless track of mainline and 1 nos. depot of navi mumbai metro line-1 project for a period of two years.
Outsourcing of track maintenance services of operational assets of ballastless track of mainline and 1 nos. depot of navi mumbai metro line-1 project for a period of two years.
Read moreComp. amc of 4 nos otis lift 1 no 14 passenger capacity, 3 no 10 passenger capacity with ard and door sensor installed at 40 court building, civil court, ranchi for the period of 3 years.
Comp. amc of 4 nos otis lift 1 no 14 passenger capacity, 3 no 10 passenger capacity with ard and door sensor installed at 40 court building, civil court, ranchi for the period of 3 years.
Read moreDeposit-construction of four new septic tank and maintenance of existing septic tanks for all wards-construction of rcc septic tank for wards at govt. mental health centre, west fort thrissur-general civil work
Deposit-construction of four new septic tank&#x0d and maintenance of existing septic tanks for all&#x0d wards-construction of rcc septic tank for&#x0d wards at govt. mental health centre, west fort&#x0d thrissur-general civil work
Read moreDesign supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Read moreSitc of 1 nos 2.0 tr 5 star inverter split ac units and allied electrical works for chamber of ddpo(delivery) at gpo kolkata.
Sitc of 1 nos 2.0 tr 5 star inverter split ac units and allied electrical works for chamber of ddpo(delivery) at gpo kolkata.
Read moreConsultancy services for provn of extension of blast wall, reclamation of sea bed and necessary shoe protecton of ffs for 120 mm tank ammun. under hemrl project and provn of ffs for 105 mm tank ammun. at new firing point, pxe under arde project.
Consultancy services for provn of extension of blast wall, reclamation of sea bed and necessary shoe protecton of ffs for 120 mm tank ammun. under hemrl project and provn of ffs for 105 mm tank ammun. at new firing point, pxe under arde project.
Read more05/ee(e)(puducherry)/cpwd/2026-27 - recall 2
Construction of 400 bedded boys hostel building at jipmer campus, puducherry. (civil work): building portion including internal water supply lines, sanitary installation, drainage, demolition of existing quarters and other development works. (electrical and mechanical installation): package c1: providing internal ei, c2: providing fire alarm system, c3: providing firefighting system, c4: providing cctv, c5: providing 3 nos. 13 passenger lift, c6: providing 5000 lpd solar water heater, c7: providing network, (agreement no.32/ee(puducherry)/cpwd/2023-24) sub head: risk and cost under clause 14 for providing 2nos. 13 passenger lift.
Read moreof your Industry type