Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Truncating The Existing 70 M Heavy Weight Micro Wave Tower To A Height Of 25m From Top Of Tower In Old Str Compound Thiruverumbur Trichy
|
Description |
Truncating The Existing 70 M Heavy Weight Micro Wave Tower To A Height Of 25m From Top Of Tower In Old Str Compound Thiruverumbur Trichy
|
Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
Tender Id | 2024_BSNL_187076_1 |
Reference Number |
25/EE/BSNL/CD/TRY/2023-24 |
Tender Fee | 590 |
EMD | 4802 |
Tender Value | |
Place | Trichy |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=204783 |
Start Date | February 20, 2024 15:30 |
End Date |
27/02/2024 ( Expired 477 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Modification of chain link fencing into security boundary wall and raising the height of entire wall (860 mtrs) from 08 feet to 12 feet and reconstruction of existing low security chain link fencing to high security boundary wall with watch tower...
Modification of chain link fencing into security boundary wall and raising the height of entire wall (860 mtrs) from 08 feet to 12 feet and reconstruction of existing low security chain link fencing to high security boundary wall with watch tower ...
Read moreIndependent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreConstruction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement
Construction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement
Read moreAnnual work of sweeping and cleaning in all type of drtain,common roads and work of daily door to door collection of garbage etc. from residential quarters situated in colony premises at atps chachai.
Annual work of sweeping and cleaning in all type of drtain,common roads and work of daily door to door collection of garbage etc. from residential quarters situated in colony premises at atps chachai.
Read moreStrengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Read moreAugmentation of power transformer capacity from existing 1x502x31.5 mva to 2x501x31.5mva at 220kv ss kalikiri in o and m circle tirupathi
Augmentation of power transformer capacity from existing 1x502x31.5 mva to 2x501x31.5mva at 220kv ss kalikiri in o and m circle tirupathi
Read moreAAAAAAAAAA
Login to viewAdvancement of water supply system by supplying and laying of 100 mm dia new di pipeline parallel to the existing old worn out pipeline from a52 nandan kanan to a67 nandan kanan in ward no-109, br-xii.
Read moreWidening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the
Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreof your Industry type