Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Complete Repairing Of 02 Nos. Side Cover Of Each Bucket Elevator 222,223,207 And 208and 01 No. Tail Tumbler Of 222,223,207 B/E Of Main Plant Of Kw
|
Description |
Complete Repairing Of 02 Nos. Side Cover Of Each Bucket Elevator 222,223,207 And 208and 01 No. Tail Tumbler Of 222,223,207 B/E Of Main Plant Of Kw
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_313205_1 |
Reference Number |
PO/KW/E-Tender/24-25/15, Dated-22.07.2024 |
Tender Fee | 0 |
EMD | 4800 |
Tender Value | |
Place | KEDLA WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324577 |
Start Date | July 23, 2024 16:30 |
End Date |
06/08/2024 ( Expired 312 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Complete repairing and re-conditioning of 02 nos. rotary motor (lhs and rhs) part no. 1ps4866 of rel-750 drill machine at nigahi project.
Complete repairing and re-conditioning of 02 nos. rotary motor (lhs and rhs) part no. 1ps4866 of rel-750 drill machine at nigahi project.
Read moreGe/khu-47/2025-26 spl repair to bldg no t-30, t-02 toilet, p-04 toilet, t-31 and p-01 toilet in the aor of age b/r-1 under ge khumbathang
Ge/khu-47/2025-26 spl repair to bldg no t-30, t-02 toilet, p-04 toilet, t-31 and p-01 toilet in the aor of age b/r-1 under ge khumbathang
Read moreConstruction of paved shoulder both side along the internal road of char emli section no.3 and 4 infront of b,d,e and f-type bunglow bhopal
Construction of paved shoulder both side along the internal road of char emli section no.3 and 4 infront of b,d,e and f-type bunglow bhopal
Read moreConstruction of paved shoulder both side along the internal road of char emli section no.1 and 2 infront of b,c,d and e-type bunglow bhopal
Construction of paved shoulder both side along the internal road of char emli section no.1 and 2 infront of b,c,d and e-type bunglow bhopal
Read moreLoosening dismantling of conv. belt 330 mtr. 1000mm width for 02 nos. damaged joint made by cold vulcanized, drive pulley lagging, gear box, oil seal changing ... unit 303 belt conveyor of main plant of kw
Loosening dismantling of conv. belt 330mtr. 1000mm width for 02 nos. damaged joint made by cold vulcanized, drive pulley lagging, gear box, oil seal changing ... unit 303 belt conveyor of main plant of kw
Read moreComplete repairing/rewinding, overhauling and testing of 3 nos, 600 kw, 6.6 kv, 1492 rpm, marathon make ht induction motor sn- 3f660566/7, 3f660566/1 and local no. q/mc/22/01.
Complete repairing/rewinding, overhauling and testing of 3 nos, 600 kw, 6.6 kv, 1492 rpm, marathon make ht induction motor sn- 3f660566/7, 3f660566/1 and local no. q/mc/22/01.
Read moreRepairing and reconditioning of 02 nos joint box of 180 kw and 370 kw ht motors, 02 nos 3.3kw er and foundation system of 3 phase alstom and marathon make a/c induction motor of karma project under kuju area.
Repairing and reconditioning of 02 nos joint box of 180 kw and 370 kw ht motors, 02 nos 3.3kw er and foundation system of 3 phase alstom and marathon make a/c induction motor of karma project under kuju area.
Read moreWork of complete repairing, rewinding and installation of 01 no. of 100 kva 11 kv 440 volts transformer make ece sl. no bccl kb erp 02 of erp center near community hall, koyla nagar
Work of complete repairing, rewinding and installation of 01 no. of 100 kva 11 kv 440 volts transformer make ece sl. no bccl kb erp 02 of erp center near community hall, koyla nagar
Read moreConstruction work of 2 nos -132kv feeder bay work at 400 kv s/s chhegaon (torni) substation for pump house - 01 and 02 and 1 no 33kv bay at 132kv chhegaon substation for pump house 03 and 1 nos 33kv bay at 132kv zhirniya substation for pump house - 4
Construction work of 2 nos -132kv feeder bay work at 400 kv s/s chhegaon (torni) substation for pump house - 01 and 02 and 1 no 33kv bay at 132kv chhegaon substation for pump house 03 and 1 nos 33kv bay at 132kv zhirniya substation for pump house - 4
Read moreSupply and installation of 10 nos. of 02 ton capacity split ac for power grid ballia, 06 nos. of 1.5 ton capacity split ac for garautha construction office and transit camp at power grid orai and 01 no tower ac (4ton) at power grid rhq lucknow through gem
Supply and installation of 10 nos. of 02 ton capacity split ac for power grid ballia, 06 nos. of 1.5 ton capacity split ac for garautha construction office and transit camp at power grid orai and 01 no tower ac (4ton) at power grid rhq lucknow through gem
Read moreof your Industry type