Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ahp Dn Unit I 2024 25 Aoh Bah Dismantling And Removing The 250 Nb 200 Nb 100 Nb 80 Nb And 65 Nb Ash Water Header Pipe
|
| Description |
Ahp Dn Unit I 2024 25 Aoh Bah Dismantling And Removing The 250 Nb 200 Nb 100 Nb 80 Nb And 65 Nb Ash Water Header Pipe
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_466236_1 |
|
Reference Number |
CE/NCTPSI/SE/MII/SpN34/2024-25 |
| Tender Fee | 0 |
| EMD | 8500 |
| Tender Value | - |
| Place | work |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=553972 |
| Start Date | July 25, 2024 23:30 |
| End Date |
Expired
08/08/2024
Expired 797 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Read moreTtps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1000 1500 mtr and cleaning of pipes in all ash slurry disposal lines
Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1000 1500 mtr and cleaning of pipes in all ash slurry disposal lines
Read moreService contract for mechanical maintenance of ash handling plant of two units of 250 mw under ahp-mm department, stps for two years
Service contract for mechanical maintenance of ash handling plant of two units of 250 mw under ahp-mm department, stps for two years
Read moreTtps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Ttps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Read moreTtps mech ii ahp replacement of clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly regular make up jetting assembly connected pipe lines flushing header assembly bah structural
Ttps mech ii ahp replacement of clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly regular make up jetting assembly connected pipe lines flushing header assembly bah structural
Read moreTtps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Read moreAhp unit iii 2024 25 aoh bah dismantling and removing the 250 nb 200 nb 100 nb 80 nb and 65 nb ash water header pipe line of bah esp leading lifting
Ahp unit iii 2024 25 aoh bah dismantling and removing the 250 nb 200 nb 100 nb 80 nb and 65 nb ash water header pipe line of bah esp leading lifting cleaning the silt sea growth chocked rubber lining
Read moreNctps i semii circle ahp dn unit i 2025 26 aoh bah dismantling and removing the 250nb 200nb 100nb 80nb and 65nb ash water header pipe line of bah
Nctps i semii circle ahp dn unit i 2025 26 aoh bah dismantling and removing the 250nb 200nb 100nb 80nb and 65nb ash water header pipe line of bah esp leading lifting cleaning the silt sea growth chocked rubber lining repositioning and refixing
Read moreAhp dn iii aoh 2024 25 bah overhauling of bottom ash hopper ash discharge gate
Ahp dn iii aoh 2024 25 bah overhauling of bottom ash hopper ash discharge gate chute scrapper feeders clinker grinders during overhaul of unit
Read moreNctps i semii circle ahp dn unit ii 2025 26 aoh bah dismantling and removing the 250nb 200nb 100nb 80nb and 65nb ash water header pipe line of bah esp leading lifting cleaning the silt sea growth chocked rubber lining repositioning
Nctps i semii circle ahp dn unit ii 2025 26 aoh bah dismantling and removing the 250nb 200nb 100nb 80nb and 65nb ash water header pipe line of bah esp leading lifting cleaning the silt sea growth chocked rubber lining repositioning
Read moreof your Industry type