Construction Of L.H.S 5m X 2.5m Rcc Box By Box Pushing Method In Lieu Of L Xing No. C 107 At Km 71/3 4 On Scpd Ptkc Section Vande Bharat Route Under Aden/Jrc
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78965448 |
Reference Number |
267-2024-25-ADEN-JRC |
Tender Fee | 0 |
EMD | 4.49 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78965448/viewNitPdf_4803286.pdf |
Start Date | December 13, 2024 19:01 |
End Date |
07/01/2025 ( Expired 128 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Elimination of l-xing no. 13 at km 20/14-15 by box pulling method (size of rcc box 6.00 x 5.00 mtr) on jhi-pnp section in the section of sse/w/pnp under aden/pnp.
For complete deion and other details, please refer to tender
Read moreConstruction of l.h.s 5m x 2.5m rcc box by box pushing method in lieu of l-xing no. c-107 at km 71/3-4 on scpd-ptkc section vande bharat route under aden/jrc
For complete deion and other details, please refer to tender
Read moreMfp-spj section: construction of rub (2 x 6m span ) by box pushing technique in place of rob in lieu of level crossing no. 59 c at km. 41/11-13 bet. khudiram bose pusa-karpurigram station.
For complete deion and other details, please refer to tender
Read moreImprovement of the drainage system by providing cover shed in the approaches of lhs at l-xing no. c-2 at km 26/4-5, c-4 at km. 30/0-1 & c-8 at km. 37/6-7 on cdg-mrnd section in the section of sse/w-1/cdg under aden/cdg.
For complete deion and other details, please refer to tender
Read moreA) elimination of lc no. 12 at rly km 787.690 construction of rcc box 5.5 x 4.5 m by pushing/sliding method on sevagram-ballharshah section. b) (i) proposed construction of cover over shed with retaining wall for lhs at lc no. 36 in aden ballharshah sub-division. (ii) proposed drainage arrangement for lhs at lc no. 65/c at km 669/2-3 between badnera-timtala section under aden wr sub-division
For complete deion and other details, please refer to tender
Read moreBalance works for construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhapuri nagbhir station on gondia chanda fort section b.g by box pushing method
Balance works for construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhapuri nagbhir station on gondia chanda fort section b.g by box pushing method
Read moreA) elimination of lc no. 12 at rly km 787.690 construction of rcc box 5.5 x 4.5 m by pushing/sliding method on sevagram-ballharshah section. b) (i) proposed construction of cover over shed with retaining wall for lhs at lc no. 36 in aden ballharshah sub-division. (ii) proposed drainage arrangement for lhs at lc no. 65/c at km 669/2-3 between badnera-timtala section under aden wr sub-division
For complete deion and other details, please refer to tender
Read moreTrd work in c/w (i) construction of lhs 5.0 x 5.0m at manned l-xings no.c-37 on asr-kemk sec by pushing method in the section under aden-ii/asr, (ii) provision of lhs in lieu of level crossing no. s-70 on ldh-asr section, (iii) construction of rob at km 6.934 in amritsar-khemkaran section and (iv) soft improvement to phagwara railway station by providing 6 meter wide covered fob with lift, waiting hall, uplifting the face of pgw station.
For complete deion and other details, please refer to tender
Read moreConstruction of l.h.s 5m x 2.5m rcc box in lieu of l-xing no. c-107 at km 71/3-4 on scpd-ptkc section vande bharat route under aden/jrc
For complete deion and other details, please refer to tender
Read moreTrd work in c/w (i) construction of lhs 5.0 x 5.0m at manned l-xings no.c-37 on asr-kemk sec by pushing method in the section under aden-ii/asr, (ii) provision of lhs in lieu of level crossing no. s-70 on ldh-asr section, (iii) construction of rob at km 6.934 in amritsar-khemkaran section and (iv) soft improvement to phagwara railway station by providing 6 meter wide covered fob with lift, waiting hall, uplifting the face of pgw station.
For complete deion and other details, please refer to tender
Read moreof your Industry type