Tender Details

About Tender

🚂 Procurement Opportunity: Helical Springs For Dmu/Tc Axles 🔧 The Ministry Of Railways, Central Government, Invites Tenders From Reputable Suppliers For The Supply Of Helical Springs Specifically Designed For Dmu/Tc Axles. 🛠️ 📅 Submission Deadline: May 09, 2024, 11:25 Am Tender Fees: Nil Emd: Nil Suppliers Must Provide Detailed Technical Specifications, Pricing, And Delivery Schedules In Their Bids. A Thorough Understanding Of The Requirements As Detailed In The Tender Document Is Essential. Keywords: Helical Springs, Dmu/Tc Axles, Ministry Of Railways, Central Government, Tender, Procurement, Railway Supplies
Particulars Details
Title
Jointless Hard Drawn Grooved Copper
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106334858
Reference
Number
46241056
Tender Fee 0
EMD 0
Tender Value -
Place Hubli
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/012025/106546086/viewNitPdf_4797238.pdf

Start Date December 06, 2024 17:33
End Date
Expired 07/01/2025

Expired 642 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of copper cables

Procurement of copper cables

Read more
Supply of copper terminals

Supply of copper terminals

Read more
Supply of hard facing welding electrodes

Supply of hard facing welding electrodes

Read more
Supply of bare copper flats

Supply of bare copper flats

Read more
Flexible copper cables for eot crane

Flexible copper cables for eot crane

Read more
Tggenco - nshes - supply of gi type earthing jumpers, earth flats and copper braided flexible jumpers at nshes, nagarjunasagar.

Tggenco - nshes - supply of gi type earthing jumpers, earth flats and copper braided flexible jumpers at nshes, nagarjunasagar.

Read more
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Read more
Supply of 62 hp submersible pump motor along with 16 sqmm, 3 core, flat submersible copper cable required for pumping of raw water from el+750 stage to el+1076 stage ,spare monoblock motor for sri giri guest house (sggh) and spare monoblock and booster pump motors for krishna veni guest house (kvgh) at slbhes, srisailam dam west

Supply of 62 hp submersible pump motor along with 16 sqmm, 3 core, flat submersible copper cable required for pumping of raw water from el+750 stage to el+1076 stage ,spare monoblock motor for sri giri guest house (sggh) and spare monoblock and booster pump motors for krishna veni guest house (kvgh) at slbhes, srisailam dam west

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise