Tender Details

Particulars Details
Title
7686/P 3/Emp 12972 Dated 09.04.2025
Description
Procurement Of Different Types Of Spares For Wet Ash Handling System Of Stage Ii And Iii At Ggsstp Ropar.
Organisation Department of Power | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 707
EMD 12000
Tender Value
Place Dy.CE/Head Quarter,GGSSTP, Rupnagar
Link

AAAAAAAAAA

Login to view
Start Date April 09, 2025 22:30
End Date

28/04/2025 ( 7 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations

Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations

Read more

Balance work of widening improvement to 2 lane lane with paved shoulder from km 27.150 to km 47.682 on dibrugarh to ledo section with proposed margherita and ledo bypass of nh 38 in tinsukia

Read more
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years

Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years

Read more
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p

Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p

Read more
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp

Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp

Read more
Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan

Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan

Read more
Slope stabilisation of banks of indus river at nimu military station under station hq nimu for a length of 236.00m under 81 rcc/ 16 brtf (p) vijayak in ladakh (ut) on epc mode

Slope stabilisation of banks of indus river at nimu military station under station hq nimu for a length of 236.00m under 81 rcc/ 16 brtf (p) vijayak in ladakh (ut) on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise