Tender Details
Particulars | Details |
---|---|
Title |
7686/P 3/Emp 12972 Dated 09.04.2025
|
Description |
Procurement Of Different Types Of Spares For Wet Ash Handling System Of Stage Ii And Iii At Ggsstp Ropar.
|
Organisation | Department of Power | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 707 |
EMD | 12000 |
Tender Value | |
Place | Dy.CE/Head Quarter,GGSSTP, Rupnagar |
Link |
AAAAAAAAAA Login to view |
Start Date | April 09, 2025 22:30 |
End Date |
28/04/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreAAAAAAAAAA
Login to viewBalance work of widening improvement to 2 lane lane with paved shoulder from km 27.150 to km 47.682 on dibrugarh to ledo section with proposed margherita and ledo bypass of nh 38 in tinsukia
Read moreHiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Read morePerformance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Read moreProcurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Read moreCarb repair kit,gasket set p h,anode,bushing,seal,bearing needles,bearing ball,seal kit,pin,bearing
Read more
Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan
Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan
Read moreSlope stabilisation of banks of indus river at nimu military station under station hq nimu for a length of 236.00m under 81 rcc/ 16 brtf (p) vijayak in ladakh (ut) on epc mode
Slope stabilisation of banks of indus river at nimu military station under station hq nimu for a length of 236.00m under 81 rcc/ 16 brtf (p) vijayak in ladakh (ut) on epc mode
Read moreof your Industry type