Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Vi/054/Apas/01/163/11/0001
|
| Description |
Development Of Sewer Line From 2, Haji Ln To 34, Benia Pukur Road In Wd 054
|
| Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
| Tender Id | 2025_KMC_951525_1 |
|
Reference Number |
VI/054/APAS/01/163/11/0001 |
| Tender Fee | 0 |
| EMD | 20000 |
| Tender Value | |
| Place | WARD 54 |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2274351 |
| Start Date | November 18, 2025 23:30 |
| End Date |
Expired
12/12/2025
Expired 202 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Read moreRepair of viaduct walkway and subsequent painting with anti-carbonation paint from qutub minar to millennium city centre gurugram metro stations of line-2 (2 years).
Repair of viaduct walkway and subsequent painting with anti-carbonation paint from qutub minar to millennium city centre gurugram metro stations of line-2 (2 years).
Read moreWidening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read moreFour laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Read moreOnstruction of an interlocking road from the shikarpur main road to neeru plot in village bagrai, block arniya
Onstruction of an interlocking road from the shikarpur main road to neeru plot in village bagrai, block arniya
Read moreBina- planning, designing, drawing & construction of ballastless track(up to 50 kmph speed) at bina station loop line number 1 and 2
For complete deion and other details, please refer to tender
Read moreConstruction of road behind...
Construction of road behind court along nala from court road to shekhpura, mc narnaul
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read more90.construction of cc road, drain, and slab from sonu house to vishnu general store, from lalu house to umesh house, and from shivnath house to sarnam house in mohalla ramnagar.
90.construction of cc road, drain, and slab from sonu house to vishnu general store, from lalu house to umesh house, and from shivnath house to sarnam house in mohalla ramnagar.
Read moreMaintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Read moreof your Industry type