Tender Details

Particulars Details
Title
Renewal With Ordinary Repair Work By P.C. On Daulatpur Link Road (Vr) In Km. 2 (440), 3, 4, 5, 6 (300)
Description
Renewal With Ordinary Repair Work By P.C. On Daulatpur Link Road (Vr) In Km. 2 (440), 3, 4, 5, 6 (300)
Organisation Chief Engineer Jhansi Zone PWD Jhansi UP | State Govt. and UT
Tender Id 2025_CEJNS_1031196_1
Reference
Number
2920/44 C-JHS Circle/2025 Date 04.04.2025
Tender Fee 3250
EMD 2.73 Lakh
Tender Value
Place Lalitpur
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1865169
Start Date April 22, 2025 18:00
End Date

29/04/2025 ( Expired 15 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode

Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode

Read more
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.

Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.

Read more
B.t. renewal work on navra to ghagharla road 1/2 to 4/6 total 3.60 km

B.t. renewal work on navra to ghagharla road 1/2 to 4/6 total 3.60 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise