Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Iv Complete Dismantling And Assembling Of Mill Internals Reconditioning Renewal Of Worn Out Parts Bearings Replacement Of Worn Out Worm Wheel With Worm Shaft Renewal Of Worm Gear Hub In Any One Mill From 4 A To 4 F Tilt
|
| Description |
Mtps I Mill Plant Unit Iv Complete Dismantling And Assembling Of Mill Internals Reconditioning Renewal Of Worn Out Parts Bearings Replacement Of Worn Out Worm Wheel With Worm Shaft Renewal Of Worm Gear Hub In Any One Mill From 4 A To 4 F Tilt
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_492265_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.233 / 2024-25 |
| Tender Fee | 0 |
| EMD | 8900 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=584934 |
| Start Date | October 09, 2024 20:30 |
| End Date |
Expired
23/10/2024
Expired 720 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreTtps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Ttps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Read moreMtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Read moreMtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Mtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreTtps mech ii bm unit iii renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during the overhaul 2026 2027
Ttps mech ii bm unit iii renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during the overhaul 2026 2027
Read moreTtps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Ttps operation circle cad dismantling, fabrication and renewal of worn out, damaged 300 nb pipe of emergency bearing cooling water line oht i to unit i, ii and iii acw system upto unit iii mill plant area from oht i to clwph entrance including supp
Read moreTtps operation circle revenue mpm i unit iii renewal of worn out support and damaged concrete pedestals and painting of newly erected supports for hot air ducts of mill 3a to 3f and providing supports for seal air fan discharge lines of 3a, 3b a
Ttps operation circle revenue mpm i unit iii renewal of worn out support and damaged concrete pedestals and painting of newly erected supports for hot air ducts of mill 3a to 3f and providing supports for seal air fan discharge lines of 3a, 3b a
Read moreTtps mech ii bm unit v renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit v renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2026 2027
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification of buck stay beam and supports renewal of worn out buck stay pin fabrication of buck stay cover etc
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification of buck stay beam and supports renewal of worn out buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and rectification of critical pipe line of crh etc
Read moreof your Industry type