Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 3 Phase 11 Kv Line By Using 100mm2 Aaac And Construction Of 3phase 11 Kv Line Dp Structure With Dismantalling Of 11kv Line At Kalinga Studio,Bhubaneswar
|
| Description |
Construction Of 3 Phase 11 Kv Line By Using 100mm2 Aaac And Construction Of 3phase 11 Kv Line Dp Structure With Dismantalling Of 11kv Line At Kalinga Studio,Bhubaneswar
|
| Organisation | IDCO | State Govt. and UT |
| Tender Id | 2024_IDCO_102857_1 |
|
Reference Number |
BBSR/ELECT/e- 23/23-24 |
| Tender Fee | 6000 |
| EMD | 36000 |
| Tender Value | |
| Place | Kalinga studio, Bhubaneswar |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=500419 |
| Start Date | March 20, 2024 00:00 |
| End Date |
Expired
28/03/2024
Expired 810 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of additional 5mva for 33/11kv substation newadiya, leduka (machhaligaw), jaunpur and construction of 11kv line from 33/11kv subsatation leduka, distt. jaunpur on semi turnkey basis.
Construction of additional 5mva for 33/11kv substation newadiya, leduka (machhaligaw), jaunpur and construction of 11kv line from 33/11kv subsatation leduka, distt. jaunpur on semi turnkey basis.
Read moreOutsourcing of usfd testing of at welds at nominated sections of line 2a, line 2b (phase i), line 7 and line 9 (phase i) including charkop and mandale depot for three years
Outsourcing of usfd testing of at welds at nominated sections of line 2a, line 2b (phase i), line 7 and line 9&#x0d (phase i) including charkop and mandale depot for three years
Read moreDesign supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Read moreCharter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.
Charter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.
Read moreTransmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)
Transmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)
Read more1.repairing of otta 2.providing and fixing fencing for cemetry 3.construction drainage pipe line (underground)4.constructing drainage pipe line (underground5.construction of c.c. drain6.providing and fixing paver block at. g.p. gharod ta. khamgaon
1.repairing of otta 2.providing and fixing fencing for cemetry 3.construction drainage pipe line (underground)4.constructing drainage pipe line (underground5.construction of c.c. drain6.providing and fixing paver block at. g.p. gharod ta. khamgaon
Read moreUnder the chief minister urban infrastructure development scheme (fourth phase) announced by the state government, construction of cc road and rcc drain in ward no. 08 as per the approval of additional construction works.
Under the chief minister urban infrastructure development scheme (fourth phase) announced by the state government, construction of cc road and rcc drain in ward no. 08 as per the approval of additional construction works.
Read moreConstruction of canopy and steel fabrication building structure, toilets at sujalpur-akodiya-sarangpur, neemuch-manasa, shajapur-nalkheda and gogapur- mahidpur- ghosla road in ujjain division.
Construction of canopy and steel fabrication building structure, toilets at sujalpur-akodiya-sarangpur, neemuch-manasa, shajapur-nalkheda and gogapur- mahidpur- ghosla road in ujjain division.
Read moreConstruction of bir raghab moran and others (8 nos) statues and memorial park at gelapukhuri, tinsukia (phase ii) (rsl 22)
Construction of bir raghab moran and others (8 nos) statues and memorial park at gelapukhuri, tinsukia (phase ii) (rsl 22)
Read moreReplacement of damaged water supply line and allied works in private room no 3 and 4 and 5 at 5th level d block of nehru hospital pgimer chandigarh
Replacement of damaged water supply line and allied works in private room no 3 and 4 and 5 at 5th level d block of nehru hospital pgimer chandigarh
Read moreof your Industry type