Tender Details

Particulars Details
Title
Ward 19 Cc Road Construction Work Vinod Ojha House To Luharpura Puliya
Description
Ward 19 Cc Road Construction Work Vinod Ojha House To Luharpura Puliya
Organisation Directorate Urban Administration and Development | State Govt. and UT
Tender Id 2023_UAD_289761_3
Reference
Number
SHIVPURI_UAD_2023_00973
Tender Fee 2295
EMD 12687
Tender Value
Place SHIVPURI
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=470276
Start Date January 30, 2025 19:30
End Date

05/02/2025 ( Expired 107 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border

Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Construction and development work under cm infra phase 4 in raisen road work, building work, other component

Construction and development work under cm infra phase 4 in raisen road work, building work, other component

Read more
The work of raising the street and constructing the drainage and interlocking and interlocking repair from khalid house in bhadasa nayapura through rizwaah, munmun, and sukhnan shah mosque to nazir neta house.

The work of raising the street and constructing the drainage and interlocking and interlocking repair from khalid house in bhadasa nayapura through rizwaah, munmun, and sukhnan shah mosque to nazir neta house.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise