Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Stop Gap Arrangement For Day To Day Cleaning Of Weigh Bridges At Amrapali
|
| Description |
|
| Organisation | COAL INDIA LIMITED | Ministry of Coal |
| Tender Id | GEM/2024/B/5430285 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 23, 2024 21:36 |
| End Date |
Expired
03/10/2024
Expired 742 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
NIYURA TECHNOLOGIES PRIVATE LIMITEDNEXTGENT T TRADING COMPANYGLOBAL LINK TRADERS...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| BPE 650VA | BPE | BPE 650VA | 2 | ₹ 3216.000 |
| DLINK SWITCH 8 PORT | D-Link | DES-1008C 10/100 Mbps Unmanaged Switch Network Switch | 6 | ₹ 4974.000 |
| RICOH Toner type 1230D Black | RICOH | RICOH Toner type 1230D Black | 5 | ₹ 21905.000 |
| HP 12A Black Original LaserJet Toner Cartridge Q2612AC | hp | HP 12A Black Original LaserJet Toner Cartridge Q2612AC | 10 | ₹ 42650.000 |
| FEVICOL SQUEEZY BOTTLE 200 gm | Fevicol | NAT-FEVICOL SQUEEZY BOTTLE 200 gm -A-I | 300 | ₹ 20250.000 |
| Luminous PC 18042 - 150AH Tubular Battery | LUMINOUS | Luminous PC 18042 - 150AH Tubular Battery with 42* months warrenty | 1 | ₹ 13850.000 |
| Nanochecker 710 | NANOCHECKER 710 | Nanochecker 710 | 1 | ₹ 349000.000 |
| JK | J K | Jk Easy Copier | 300 | ₹ 48897.000 |
| Lotus Eazy Ruled Register Hard Bound 96 Page 180 x 295 mm | LOTUS | Lotus Eazy 96 PAGES | 30 | ₹ 1080.000 |
| jungle boot direct moulded pu sole in pairs | Sk | SK | 13 | ₹ 4550.000 |
| Samsungtonercartridge MLT-D101S | SAMSUNG | MLT-D101S | 20 | ₹ 35900.000 |
| Notebook Computers-Laptop | Lenovo | Lenovo Notebook V110-i3 6th gen processor, 4GB RAM, 1TB HDD, 15.6" ,Win10pro,3 yrs | 5 | ₹ 165000.000 |
| Electronic Weighing Scale - Capacity 20 kg, Accuracy 5 g | PHOENIX | SMART-20 | 9 | ₹ 31500.000 |
| VIM SOAP | Vim | VIM SOAP | 50 | ₹ 1000.000 |
| spectra FS paper | Trident Paper FS | spectra FS 75 gsm | 100 | ₹ 21000.000 |
| COPIER PAPER A4 75 GSM CT | Trident | TRIDENT SPECTRA | 100 | ₹ 17550.000 |
| Bajaj Faratta 500mm Grey Pedestal Fan | BAJAJ | Bajaj Faratta 500mm Grey Pedestal Fan | 2 | ₹ 6599.980 |
| WONDER TAPE 2" 35 MTR TRASPARENT TAPE | wonder | WONDER TAPE 2" 35 MTR TRASPARENT TAPE | 100 | ₹ 2200.000 |
| HP LaserJet Pro P1108 Printer | hp | HP LaserJet Pro P1108 | 2 | ₹ 17600.000 |
| Rubber Gloves | NA | Rubber Gloves | 100 | ₹ 5900.000 |
Barricading work for security arrangement of law and order function and other function under hamidia road section under central store sub dn. pwd. bhopal.
Barricading work for security arrangement of law and order function and other function under hamidia road section under central store sub dn. pwd. bhopal.
Read moreFor providing hire charges of temporary light arrangement 1st call. p. a. c. 4827560.00 on non sor, completion period 365 days (i/c rainy season)
For providing hire charges of temporary light arrangement, pa system, led screen, cctv camera, dg set for organising programme at national festivel and vip/vvip programme at nirman bhawan, 74 bungalows, char imli, professor coloney, rest house, circu
Read moreStrengthening of mofada khedi ahir bamhangaon road, total length 4.80 km. (proposed length 1.81 km.) under p.w.d. sub dn. seoni malwa. 3rd call, pac rs. 121.44 lacs on road bridge works sor 11.04.2025 (ammendment upto date), completion period 90 day
Strengthening of mofada khedi ahir bamhangaon road, total length 4.80 km. (proposed length 1.81 km.) under p.w.d. sub dn. seoni malwa. 3rd call, pac rs. 121.44 lacs on road bridge works sor 11.04.2025 (ammendment upto date), completion period 90 day
Read moreLeekage/seepage, plaster repairing, flooring, white wash, flyproof wire, plumbing and sanitary fitting work in ent opd and academic area and various civil work in male day care cancer ward in sci under nscb medical college jabalpur. (deposit work)
Leekage/seepage, plaster repairing, flooring, white wash, flyproof wire, plumbing and sanitary fitting work in ent opd and academic area and various civil work in male day care cancer ward in sci under nscb medical college jabalpur. (deposit work)
Read moreNortheast monsoon remove of tree branches flood-hit areas and arrangement 2 no s lmv tata ace vehicle (per day 2 shift) hire basis for 92 days in division-64 and 78,unit-15,16 and 17, zone-6.
Northeast monsoon remove of tree branches flood-hit areas and arrangement 2 no s lmv tata ace vehicle (per day 2 shift) hire basis for 92 days in division-64 and 78,unit-15,16 and 17, zone-6.
Read moreProviding of led rgb par can lights and fixing of truss of 24 feet height for arranging the lights for the stage arrangement in view of bathukamma festival on 18.10.2026 (one day) at idl lake in 253 kaithalapur division of kukatpally circle 52 kukatpally zone cmc
Providing of led rgb par can lights and fixing of truss of 24 feet height for arranging the lights for the stage arrangement in view of bathukamma festival on 18.10.2026 (one day) at idl lake in 253 kaithalapur division of kukatpally circle 52 kukatpally zone cmc
Read more1.electrical portion of the work bsp div.: expansion of hss no. 01 school with construction of 30 classrooms. 2.electrical portion of the work setting up of mechanized laundry of capacity 10 tons per day at bilaspur settlement area. 3.bilaspur provision of back up power supply arrangement ups for phod offices, drm and adrm offices.4.improvement of electrical systems for psa oxygen plant at central hospital, bilaspur.
1.electrical portion of the work bsp div.: expansion of hss no. 01 school with construction of 30 classrooms. 2.electrical portion of the work setting up of mechanized laundry of capacity 10 tons per day at bilaspur settlement area. 3.bilaspur provision of back up power supply arrangement ups for phod offices, drm and adrm offices.4.improvement of electrical systems for psa oxygen plant at central hospital, bilaspur.
Read moreDrill s.s. twist block,cordless electric drill machine,gi pipe bending machine,brake test arrangement,well type mano meters,bourden tube pressure gauge,valve positioners booster relays,portable-air lpg brazing kit,core drill machine,vernier bevel protractor,marking table surface plate table,blocks vee 150 x 100 x 100 mm,reamer machine,scraper flat,scraper 3 corner,scraper half round,power tool,knurling tool,boring bar indexable,dowel pin,standard tap screws,lapping plate 6 inch dia,medium carbon heat treated alloy steel,caps screws,drills guage straight,drills guage straight,drill gauge,globe valve cast iron,gate valve dia,stop cock,pipe mild steel,g.i. pipe,flange slip-on,jigs fixture,pulleys,key,gear - spur old damaged,belt v,washer clutch keys,drift drill,bearing different types,lifting sling,welding cables,table for gas welding,compressor unit suitable for pressure
Drill s.s. twist block,cordless electric drill machine,gi pipe bending machine,brake test arrangement,well type mano meters,bourden tube pressure gauge,valve positioners booster relays,portable-air lpg brazing kit,core drill machine,vernier bevel protractor,marking table surface plate table,blocks vee 150 x 100 x 100 mm,reamer machine,scraper flat,scraper 3 corner,scraper half round,power tool,knurling tool,boring bar indexable,dowel pin,standard tap screws,lapping plate 6 inch dia,medium carbon heat treated alloy steel,caps screws,drills guage straight,drills guage straight,drill gauge,globe valve cast iron,gate valve dia,stop cock,pipe mild steel,g.i. pipe,flange slip-on,jigs fixture,pulleys,key,gear - spur old damaged,belt v,washer clutch keys,drift drill,bearing different types,lifting sling,welding cables,table for gas welding,compressor unit suitable for pressure
Read moreDay-to-day maintenance of residential quarters for 45 days as stop gap arrangement at ananta vihar colony of aocp, under jagannath area.
Day-to-day maintenance of residential quarters for 45 days as stop gap arrangement at ananta vihar colony of aocp, under jagannath area.
Read moreof your Industry type