Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
M/O Of Stp (Replacement Of Rising Main Line From Sps Well To Primary Unit Of 34 Mld Stp At Sec 50) (Stp Core Work) Noida
|
| Description |
M/O Of Stp (Replacement Of Rising Main Line From Sps Well To Primary Unit Of 34 Mld Stp At Sec 50) (Stp Core Work) Noida
|
| Organisation | New Okla Industrial Development Authority | State Govt. and UT |
| Tender Id | 2025_NOIDA_1033769_1 |
|
Reference Number |
01/SM(JAL-OA)/25-26 |
| Tender Fee | 2832 |
| EMD | 1.14 Lakh |
| Tender Value | - |
| Place | NOIDA |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1919585 |
| Start Date | July 09, 2025 16:30 |
| End Date |
Expired
15/07/2025
Expired 455 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of sewerage (construction of sump well at 5 percent abadi plots area in sector-145 for sewer disposal of sector -145, 144 5 percent area and sector-144 partially and p/l laying rising main line sump well to ips-1 expressway) noida.
Strengthening of sewerage (construction of sump well at 5 percent abadi plots area in sector-145 for sewer disposal of sector -145, 144 5 percent area and sector-144 partially and p/l laying rising main line sump well to ips-1 expressway) noida.
Read moreProviding laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Read moreProviding laying cutting testig of sewer rcc np 3 with hdpe lining and rising main d i k 9 pipe cont m h chamber hatch box mps and survey design supply and soil testing const inst comm of 20 mld stp cum 60 kld fstp inclluding o and m gurdaspur
Providing laying cutting testnig of sewer rcc np 3 with hdpe lining and rising main d i k 9 pipe cont m h chamber hatch box mps and survey design supply and soil testing const inst comm of 20 mld stp cum 60 kld fstp including o and m gurdaspur
Read moreM/o of stp ( replacement of damaged m.s. air header from air blower to sbr basin of 34 mld at stp sec -50) (core work of stp) noida
M/o of stp ( replacement of damaged m.s. air header from air blower to sbr basin of 34 mld at stp sec -50) (core work of stp) noida
Read moreRehabilitation of 1.50 mld trivenipuram sps and laying of rising main
Rehabilitation of 1.50 mld trivenipuram sps and laying of rising main
Read moreStrengthening of sewerage (providing and laying of rising main sewer line for various sps (28, 18, 15a, 16, 31) to stp-54 and sps-10/33), noida.
Strengthening of sewerage (providing and laying of rising main sewer line for various sps (28, 18, 15a, 16, 31) to stp-54 and sps-10/33), noida
Read moreSupply,installation,testing and commissioning ocems and flow meter including five year running,operation and maintenance of period 60 months,at 137 mld stp kasna,15mld stp sec-ecotech-2,20mld stp sec-ecotech-3,2/10 mld stp sadopur,badalpur,gr noida
Supply,installation,testing and commissioning ocems and flow meter including five year running,operation and maintenance of period 60 months,at 137 mld stp kasna,15mld stp sec-ecotech-2,20mld stp sec-ecotech-3,2/10 mld stp sadopur,badalpur,gr noida
Read moreM/o of stp (supply and fixing of sluice gate for discharge chamber of 50 and 100 mld stp at sec-168) noida
M/o of stp (supply and fixing of sluice gate for discharge chamber of 50 and 100 mld stp at sec-168) noida
Read moreStrengthening of sewerage (replacement of rising main sewer line near sps-43), noida
Strengthening of sewerage (replacement of rising main sewer line near sps-43), noida
Read moreProviding cross connection at 32 mld stp from 21 mld stp rising main in nashik road division. ( re tender -3)
Providing cross connection at 32 mld stp from 21 mld stp rising main in nashik road division. ( re tender -3)
Read moreof your Industry type