Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Outsourcing Of Canteen Work Of Wagon Repair Shop, W.C. Rly., Kota For A Period Of 12 Months.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75515329 |
|
Reference Number |
M324-2-6-Canteen-Tend-04 |
| Tender Fee | 0 |
| EMD | 37100 |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/082024/75515329/viewNitPdf_4595324.pdf |
| Start Date | July 13, 2024 18:00 |
| End Date |
Expired
06/08/2024
Expired 796 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Outsourcing contract for supply of 06 persons per day for canteen services including cooking, serving of food and maintenance of canteen at gdk-1 and 3 incline, rg.1 area for a period of two (2) years under unit rate system
Outsourcing contract for supply of 06 persons per day for canteen services including cooking, serving of food and maintenance of canteen at gdk-1 and 3 incline, rg.1 area for a period of two (2) years under unit rate system
Read moreLaying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)
Laying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)
Read moreEngaging of security guards (12 nos) at bum rukn ud dowla lake in shastripuram, attapur, in rajendranagar zone, ghmc for the year 2026-27 for a period of 12 months
Engaging of security guards (12 nos) at bum rukn ud dowla lake in shastripuram, attapur, in rajendranagar zone, ghmc for the year 2026-27 for a period of 12 months
Read moreTransportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Read moreHiring of 2 nos. of 750kva, 3-phase, 440v diesel generator sets for a period of 12 months with 600hrs/month/generator for use at naini coal mine of sccl, chhendipada, odisha state.
Hiring of 2 nos. of 750kva, 3-phase, 440v diesel generator sets for a period of 12 months with 600hrs/month/generator for use at naini coal mine of sccl, chhendipada, odisha state.
Read moreExtension of services of the four (04) security guards deployed in parks for a period of seven (07) months, from september, 2026 to march, 2027 in the office of the deputy director,serilingampally zone,cmc (item-02)(2nd call)
Extension of services of the four (04) security guards deployed in parks for a period of seven (07) months, from september, 2026 to march, 2027 in the office of the deputy director,serilingampally zone,cmc (item-02)(2nd call)
Read moreTransportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Read moreLaying of cc road at a)shivalayam ( opposite hindu graveyard) at padma nagar and b) h.no : 49-243/1/a to shop no 49/243 at balreddynagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (reserved for sc) (item no.5) (completion period 1.5 month)
Laying of cc road at a)shivalayam ( opposite hindu graveyard) at padma nagar and b) h.no : 49-243/1/a to shop no 49/243 at balreddynagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (reserved for sc) (item no.5) (completion period 1.5 month)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type