Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Metallic Expansion Bellow For Overhauling Of Unit 2 Flue Gas Air Duct Under Bm Dept. At Bk Tps
|
Description |
Procurement Of Metallic Expansion Bellow For Overhauling Of Unit 2 Flue Gas Air Duct Under Bm Dept. At Bk Tps
|
Organisation | Government of West Bengal |
Tender Id | 2023_WBPDC_562055_1 |
Reference Number |
WBPDCL/BkTPS/OT/E2719/23-24 |
Tender Fee | 0 |
EMD | 34700 |
Tender Value | |
Place | Administrative Bldg, BKTPS |
Link | https://wbtenders.gov.in |
Start Date | September 08, 2023 19:30 |
End Date |
29/09/2023 ( Expired 620 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Read moreHiring of silent diesel generator sets for the use at various locations under syama prasad mookerjee port, kolkata for a period of 2 years
Hiring of silent diesel generator sets for the use at various locations under syama prasad mookerjee port, kolkata for a period of 2 years
Read moreAnnual rate contract for refilling, testing etc. of h2 gas cylinders of bktps for 2 years.
Annual rate contract for refilling, testing etc. of h2 gas cylinders of bktps for 2 years.
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreOverhauling of flue gas damper assembly of aph inlet/primary/secondary air, servicing of esp inlet gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the capital overhauling of unit6 of 2x250mw
Overhauling of flue gas damper assembly of aph inlet/primary/secondary air, servicing of esp inlet gate,&#x0d reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the capital&#x0d overhauling of unit6 of 2x250mw
Read moreSpl rep wks in bldg no bts 65 at 223 fd spl rep to bldg no b ts 82 b ts 73 at 223 fd regt and provn of guard room for 2 9 ge under ge 859 ews
Spl rep wks in bldg no bts 65 at 223 fd spl rep to bldg no b ts 82 b ts 73 at 223 fd regt and provn of guard room for 2 9 ge under ge 859 ews
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreDevelopment of cold store (50 mt) and marketing facilities for haringhata meat at nawabhat, fagupur, purba burdwan-713104 under west bengal livestock development corporation limited,lb-2, sector-iii,salt lake,kolkata during the financial year 2025-26
Development of cold store (50 mt) and marketing facilities for haringhata meat at nawabhat, fagupur, purba burdwan-713104 under west bengal livestock development corporation limited,lb-2, sector-iii,salt lake,kolkata during the financial year 2025-26
Read moreAnnual maintenance contract for repair and maintenance of 02 nos. industrial air conditioners (25 kw, sunbeam make) fitted in pcr unit of 02 nos. 24/96 dragline (krishna and balram dragline) working at nigahi project, ncl for a period of one year.
Annual maintenance contract for repair and maintenance of 02 nos. industrial air conditioners (25 kw, sunbeam make) fitted in pcr unit of 02 nos. 24/96 dragline (krishna and balram dragline) working at nigahi project, ncl for a period of one year.
Read moreAnnual rate contract for undertaking clean and dirty air flow tests for pulverizes of unit 1 to 5, bktpp for a period of 2 years.
Annual rate contract for undertaking clean and dirty air flow tests for pulverizes of unit 1 to 5, bktpp for a period of 2 years.
Read moreof your Industry type